APC 10-40 KVA 380/400/415 V manual Shaped floor

Page 12

Anchor the UPS and additional XR Battery or UPS Enclosure(s) (optional)

Note: Enclosures can be kept apart or assembled and anchored with interconnection plates and

brackets: SUVTOPT004: 352 mm (13.85 in) UPS enclosure to XR enclosure, SUVTOPT005:

523 mm (20.59 in) UPS enclosure to XR enclosure, or SUVTOPT006: XR enclosure to XR enclosure.

Note: A baying kit includes three U-shaped floor anchoring brackets. In situations where a UPS or XR Battery Enclosure must be added to an existing configuration of two or more bayed together enclosures, only one of the U-shaped floor anchoring brackets is necessary. In those situations, please dispose of the two superfluous U-shaped floor anchoring brackets.

Note: The L-shaped floor anchoring brackets that secured the enclosure to the pallet during shipment may be used for a stand-alone UPS enclosure to enhance stability, but is not necessary when baying enclosures together. Instead, the three U-shaped floor anchoring brackets from the baying kit are used.

1.Remove the side panels from the enclosure(s) to get access to the holes in the bottom frame.

UPS

XR

Note: Make sure that the enclosures

are level to be able to anchor the enclosures to each other.

2. Position two U-

Front of enclosure

Front of adjacent

shaped floor

 

enclosure

anchoring

 

 

brackets under

U-shaped floor

 

one enclosure;

anchoring

 

one in each

bracket

 

side.

 

 

 

 

8

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

Image 12
Contents Installation Page Contents Post-Installation Checklist Safety Important Safety Instructions Save These InstructionsPrepare for Floor-Anchoring optional System arrangementsFour one in each corner. Recommended floor bolt size M8 Model width 352 mm 13.85 Prepare for Cables Remove the front panelRemove the top cover Remove the cable landing cover and bottom plates Remove the XR Battery Modules Shaped floor Page Insert Connect Power in Installations with Busbars Install isolatorsRun the Cables Install busbars UPS XR1 XR2 XR2 XR1 UPS See Connect the EPO on Connect Power in Installations with Cables Install power cablesFeed the cable up Connect Communication Cables Connect the EPO to the UPS and the XR Battery Enclosure Connect the EPOFinal Mechanical Assembly Level the enclosuresInstall battery-securing and floor-anchoring brackets Reinstall the Enclosure Plates Specifications Battery voltage and currentTorque specification Recommended cable sizesPost-Installation Checklist Page Page Page 990-1740D-001 11/2009