APC 10-40 KVA 380/400/415 V manual Prepare for Floor-Anchoring optional, System arrangements

Page 6

Prepare for Floor-Anchoring (optional)

Note: If floor anchoring and battery securing is required, read this section. If not, see “Prepare for Cables” on page 5.

Note: Allow for enough working space behind the enclosure for electrical work to be carried out (e.g. if you want to install a conduit box or if you want to connect an XR Battery Enclosure at a later stage). Minimum rear clearance is 100 mm (3.93 in) and must comply with applicable national and local codes. 600 mm (23.6 in) is recommended.

Note: The L-shaped floor anchoring brackets that secured the enclosure to the pallet during shipment may be used for a stand-alone UPS enclosure to enhance stability. See this chapter for hole positions and see also “Level the Enclosures (L-shaped Floor Anchoring Brackets) and Install Batteries” on page 20. The L-shaped floor anchoring brackets are not necessary when baying enclosures together. Instead, the three U-shaped floor anchoring brackets from the baying kit are used.

Note: Hole positions are only intended as a guide.

System arrangements

APC recommends the following arrangements of UPS units and XR Battery Enclosures (XR) in parallel.

Examples with two parallel systems using baying kits.

UPS

XR

XR

XR

XR

UPS

XR

XR

XR

XR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

XR

XR

XR

XR

UPS

UPS

XR

XR

XR

XR

 

 

 

 

 

 

 

 

 

 

UPS XR XR

XR XR

UPS XR XR XR XR

2

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

Image 6
Contents Installation Page Contents Post-Installation Checklist Safety Important Safety Instructions Save These InstructionsPrepare for Floor-Anchoring optional System arrangementsFour one in each corner. Recommended floor bolt size M8 Model width 352 mm 13.85 Prepare for Cables Remove the front panelRemove the top cover Remove the cable landing cover and bottom plates Remove the XR Battery Modules Shaped floor Page Insert Connect Power in Installations with Busbars Install isolatorsRun the Cables Install busbars UPS XR1 XR2 XR2 XR1 UPS See Connect the EPO on Connect Power in Installations with Cables Install power cablesFeed the cable up Connect Communication Cables Connect the EPO to the UPS and the XR Battery Enclosure Connect the EPOFinal Mechanical Assembly Level the enclosuresInstall battery-securing and floor-anchoring brackets Reinstall the Enclosure Plates Torque specification SpecificationsBattery voltage and current Recommended cable sizesPost-Installation Checklist Page Page Page 990-1740D-001 11/2009