352 mm (13.85 in) UPS system with the UPS placed to the right (seen from the front).

XR2

XR1

UPS

N

+

1.Install the following baying kit busbars between the UPS and XR1:

880-1604 between the vertical busbar N on the UPS and busbar 4 on XR1 880-0939 between the vertical busbar (+) on the UPS and busbar 1 on XR1 880-1604 between the vertical busbar (-) on the UPS and busbar 6 on XR1

2.Install the following baying kit busbars between two XR Battery Enclosures: 880-0926 between the vertical busbar 3 on XR1 and busbar 4 on XR2 880-0940 between the vertical busbar 2 on XR1 and busbar 1 on XR2 880-0941 between the vertical busbar 5 on XR1 and busbar 6 on XR2

14

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

Image 18
Contents Installation Page Contents Post-Installation Checklist Safety Important Safety Instructions Save These InstructionsPrepare for Floor-Anchoring optional System arrangementsFour one in each corner. Recommended floor bolt size M8 Model width 352 mm 13.85 Prepare for Cables Remove the front panelRemove the top cover Remove the cable landing cover and bottom plates Remove the XR Battery Modules Shaped floor Page Insert Connect Power in Installations with Busbars Install isolatorsRun the Cables Install busbars UPS XR1 XR2 XR2 XR1 UPS See Connect the EPO on Connect Power in Installations with Cables Install power cablesFeed the cable up Connect Communication Cables Connect the EPO to the UPS and the XR Battery Enclosure Connect the EPOFinal Mechanical Assembly Level the enclosuresInstall battery-securing and floor-anchoring brackets Reinstall the Enclosure Plates Torque specification SpecificationsBattery voltage and current Recommended cable sizesPost-Installation Checklist Page Page Page 990-1740D-001 11/2009