APC 10-40 KVA 380/400/415 V manual Contents

Page 3

Contents

Safety

1

IMPORTANT SAFETY INSTRUCTIONS

- SAVE THESE INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Prepare for Floor-Anchoring (optional)

2

System arrangements

2

Hole positions for a stand-alone UPS enclosure with L-shaped

 

anchoring brackets

3

Hole positions for up to four UPS units in parallel with U-shaped

 

anchoring brackets. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Prepare for Cables

5

Remove the front panel

5

Remove the top cover

5

Remove the cable landing cover and bottom plates

6

Remove the XR Battery Modules

7

Anchor the UPS and additional XR Battery or

UPS Enclosure(s) (optional). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

Run the Cables

11

Connect Power in Installations with Busbars . . . . . . . . . . . . . . . . . 11

Install isolators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Install busbars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Connect Power in Installations with Cables. . . . . . . . . . . . . . . . . . . 16

Install power cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

Connect Communication Cables. . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Connect the EPO. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

Connect the EPO to the UPS and the XR Battery Enclosure . . . . 19

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

i

Image 3
Contents Installation Page Contents Post-Installation Checklist Important Safety Instructions Save These Instructions SafetySystem arrangements Prepare for Floor-Anchoring optionalFour one in each corner. Recommended floor bolt size M8 Model width 352 mm 13.85 Prepare for Cables Remove the front panelRemove the top cover Remove the cable landing cover and bottom plates Remove the XR Battery Modules Shaped floor Page Insert Connect Power in Installations with Busbars Install isolatorsRun the Cables Install busbars UPS XR1 XR2 XR2 XR1 UPS See Connect the EPO on Install power cables Connect Power in Installations with CablesFeed the cable up Connect Communication Cables Connect the EPO Connect the EPO to the UPS and the XR Battery EnclosureLevel the enclosures Final Mechanical AssemblyInstall battery-securing and floor-anchoring brackets Reinstall the Enclosure Plates Recommended cable sizes SpecificationsBattery voltage and current Torque specificationPost-Installation Checklist Page Page Page 11/2009 990-1740D-001