APC 10-40 KVA 380/400/415 V manual Reinstall the Enclosure Plates

Page 26

Reinstall the Enclosure Plates

Reinstall the cable landing cover plates and the bottom plates

1.Reinstall the cable landing cover plates on the XR Battery Enclosure(s)

2.Install the upper part of the conduit box (if applicable) on all enclosures.

3.Reinstall the bottom plates on the UPS and the XR Battery Enclosure(s).

Reinstall the top cover, battery compartment cover, and the front panel

1.Reinstall the top cover by fastening the four screws at the front and the two screws at the back.

2.Reinstall the battery compartment cover (only applicable to Japanese configurations) by placing the taps in the slots at the bottom of the enclosure and at the top of the enclosure.

3.Attach the battery compartment cover with M6 screws to the inner side panels in both sides.

5.Reinstall the front panel by inserting the two taps at the bottom of the front panel into the two slots at the bottom of the enclosure.

6.Push the front panel forward until it engages the locking devices at the top of the enclosure.

7.Use a screwdriver to set the lock mechanism to the locked position

22

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

Image 26
Contents Installation Page Contents Post-Installation Checklist Safety Important Safety Instructions Save These InstructionsPrepare for Floor-Anchoring optional System arrangementsFour one in each corner. Recommended floor bolt size M8 Model width 352 mm 13.85 Remove the top cover Prepare for CablesRemove the front panel Remove the cable landing cover and bottom plates Remove the XR Battery Modules Shaped floor Page Insert Run the Cables Connect Power in Installations with BusbarsInstall isolators Install busbars UPS XR1 XR2 XR2 XR1 UPS See Connect the EPO on Connect Power in Installations with Cables Install power cablesFeed the cable up Connect Communication Cables Connect the EPO to the UPS and the XR Battery Enclosure Connect the EPOFinal Mechanical Assembly Level the enclosuresInstall battery-securing and floor-anchoring brackets Reinstall the Enclosure Plates Torque specification SpecificationsBattery voltage and current Recommended cable sizesPost-Installation Checklist Page Page Page 990-1740D-001 11/2009