APC
10-40 KVA 380/400/415 V
manual
Specs
Install
Final Mechanical Assembly
Remove the XR Battery Modules
Safety
Page 31
Page 30
Page 32
Image 31
Page 30
Page 32
Contents
Installation
Page
Contents
Post-Installation Checklist
Important Safety Instructions Save These Instructions
Safety
System arrangements
Prepare for Floor-Anchoring optional
Four one in each corner. Recommended floor bolt size M8
Model width 352 mm 13.85
Remove the front panel
Prepare for Cables
Remove the top cover
Remove the cable landing cover and bottom plates
Remove the XR Battery Modules
Shaped floor
Page
Insert
Install isolators
Connect Power in Installations with Busbars
Run the Cables
Install busbars
UPS XR1 XR2
XR2 XR1 UPS
See Connect the EPO on
Install power cables
Connect Power in Installations with Cables
Feed the cable up
Connect Communication Cables
Connect the EPO
Connect the EPO to the UPS and the XR Battery Enclosure
Level the enclosures
Final Mechanical Assembly
Install battery-securing and floor-anchoring brackets
Reinstall the Enclosure Plates
Recommended cable sizes
Specifications
Battery voltage and current
Torque specification
Post-Installation Checklist
Page
Page
Page
11/2009
990-1740D-001
Related pages
Troubleshooting Tips for Casablanca Fan Company C45GxxxB
Specifications Model 3860A for Eiki 3860A
Error Messages for Dell 9010
Lubrication Chart for Craftsman 917.377431
Installation for ADIC 3.5
Illustrated Parts List for Homelite UT44171
DVD Brand Code List for Samsung HW-C770S/XEE
What is included in the
Jura Impressa E40 instructions
?
Top
Page
Image
Contents