APC
10-40 KVA 380/400/415 V
manual
Specifications
Install
Final Mechanical Assembly
Remove the XR Battery Modules
Safety
Page 2
Page 1
Page 3
Image 2
Page 1
Page 3
Contents
Installation
Page
Contents
Post-Installation Checklist
Safety
Important Safety Instructions Save These Instructions
Prepare for Floor-Anchoring optional
System arrangements
Four one in each corner. Recommended floor bolt size M8
Model width 352 mm 13.85
Remove the top cover
Prepare for Cables
Remove the front panel
Remove the cable landing cover and bottom plates
Remove the XR Battery Modules
Shaped floor
Page
Insert
Run the Cables
Connect Power in Installations with Busbars
Install isolators
Install busbars
UPS XR1 XR2
XR2 XR1 UPS
See Connect the EPO on
Connect Power in Installations with Cables
Install power cables
Feed the cable up
Connect Communication Cables
Connect the EPO to the UPS and the XR Battery Enclosure
Connect the EPO
Final Mechanical Assembly
Level the enclosures
Install battery-securing and floor-anchoring brackets
Reinstall the Enclosure Plates
Torque specification
Specifications
Battery voltage and current
Recommended cable sizes
Post-Installation Checklist
Page
Page
Page
990-1740D-001
11/2009
Related pages
Troubleshooting for Belkin F5U301
MAX-CSD10 Specifications for AMX MAX-CSD10
Error Codes for HP TeemTalk Terminal Emulator 7 E-License
Brute Deluxe 1000 Connection Diagram for Bradford-White Corp BMT2H
HOW to USE the Fitness AGE Test for NordicTrack NTTL24080
Installation Data Sheet for Enviro EG28-120
Replacement Parts List for circuit cards for Carvin CX1272
To create a Forced Account Code List for Lucent Technologies 4.1
By Online Upgrade the software using the Internet for Samsung LE46C653
Auto tuning for Sherwood RX-770
How can I copy files to my PC without
PHOTOfunSTUDIO
?
Top
Page
Image
Contents