APC
10-40 KVA 380/400/415 V
manual
Specification
Install
Final Mechanical Assembly
Remove the XR Battery Modules
Safety
Page 30
Page 29
Page 31
Image 30
Page 29
Page 31
Contents
Installation
Page
Contents
Post-Installation Checklist
Safety
Important Safety Instructions Save These Instructions
Prepare for Floor-Anchoring optional
System arrangements
Four one in each corner. Recommended floor bolt size M8
Model width 352 mm 13.85
Prepare for Cables
Remove the front panel
Remove the top cover
Remove the cable landing cover and bottom plates
Remove the XR Battery Modules
Shaped floor
Page
Insert
Connect Power in Installations with Busbars
Install isolators
Run the Cables
Install busbars
UPS XR1 XR2
XR2 XR1 UPS
See Connect the EPO on
Connect Power in Installations with Cables
Install power cables
Feed the cable up
Connect Communication Cables
Connect the EPO to the UPS and the XR Battery Enclosure
Connect the EPO
Final Mechanical Assembly
Level the enclosures
Install battery-securing and floor-anchoring brackets
Reinstall the Enclosure Plates
Torque specification
Specifications
Battery voltage and current
Recommended cable sizes
Post-Installation Checklist
Page
Page
Page
990-1740D-001
11/2009
Related pages
Troubleshooting for Belkin F1UP0001
Specifications for 3Com 3CRDSF9PWR
If the error code E5 appears in the Pulse display for ProForm PFTL05050
Diagram for Impex IGS-705
How to set-up for ViewSonic VS12541
Locate and install software for HP V6016EA
Parts List for Troy-Bilt 420
Smtp Error Code List for Multitech FF240
Included Accessories for EdgeStar EAC211TS
Layer 2 WAN Access for HP MSR3000 Router
How often should I consult the Exmark troubleshooting manual?
Consulting the Manual
Top
Page
Image
Contents