Epson TM-FX2180 manual Sensors, Sensor Test Points

Page 32

EPSON FX-2180 Service Manual

Chapter 3 Troubleshooting

 

 

3.2.2Sensors

Table 3-2. Sensor Test Points

Sensor

 

Test Pin

 

Test Method

 

 

Meter Reading

Connector

 

Numbers

 

(Set the meter to DC

 

 

 

 

 

 

 

voltage.)

 

 

 

 

 

 

 

 

 

 

 

CN4

 

1: HP

 

Place one lead on pin 1 and

 

Open: +5 V

(HP sensor)

 

2: GND

 

the other lead on pin 2.

 

 

(home position)

 

 

3: +5 V

 

Check the resistances while

 

Short: 0 V

 

 

 

 

blocking the two sensor

 

 

(not in home

 

 

 

 

terminals.

 

 

position)

CN5

 

1: +5 V

 

Place one lead on pin 2 and

 

Open: +5 V

(rear PE

 

2: PE

 

the other lead on pin 3.

 

 

(Paper is loaded.)

sensor)

 

3: GND

 

Check the resistances while

 

Short: 0 V

 

 

 

 

toggling the rear PE sensor

 

 

(No paper is

 

 

 

 

lever.

 

 

loaded.)

CN6

 

1: PE

 

Place one lead on pin 1 and

 

Open: +5 V

(front PE

 

2: GND

 

the other lead on pin 2.

 

 

(Paper is loaded.)

sensor)

 

 

 

Check the resistances while

 

Short: 0 V

 

 

 

 

toggling the front PE sensor

 

 

(No paper is

 

 

 

 

lever.

 

 

loaded.)

CN7

 

1: E

 

Place one lead on pin 2 and

 

Open: 0 V

(TOP sensor)

 

2: GND

 

the other lead on pin 3.

 

 

(No paper is

 

 

3: +5 V

 

Check the resistances while

 

 

loaded.)

 

 

4: A

 

inserting and removing paper

 

Short: +5 V

 

 

 

 

between the platen and the

 

 

(Paper is loaded.)

 

 

 

 

sensor.

 

 

 

Table 3-2. Sensor Test Points (Continued)

Sensor

 

Test Pin

 

Test Method

 

 

Meter Reading

Connector

 

Numbers

 

(Set the meter to DC

 

 

 

 

 

 

 

voltage.)

 

 

 

 

 

 

 

 

 

 

 

CN12

 

1: Release 1

 

1. Place one lead on

 

Open: +5 V

(paper release

 

2: GND

 

pin 1 and the other

 

Short: 0 V

sensors 1 and 2)

 

3: Release 2

 

lead on pin 2. Check

 

 

 

 

 

4: GND

 

the resistances

 

 

 

 

 

 

 

while toggling the

 

 

 

 

 

 

 

paper release lever.

 

 

 

 

 

 

 

2. Place one lead on

 

 

 

 

 

 

 

pin 3 and the other

 

 

 

 

 

 

 

lead on pin 4. Check

 

 

 

 

 

 

 

the resistances

 

 

 

 

 

 

 

while toggling the

 

 

 

 

 

 

 

paper release lever.

 

 

 

CN13

 

1: PG 1

 

Place one lead on pin 1

 

Open: +5 V

(PG sensors 1

 

2: GND

 

and the other lead on

 

Short: 0 V

and 2)

 

3: PG 2

 

pin 2. Check the

 

 

 

 

 

4: GND

 

resistances while

 

 

 

 

 

 

 

toggling the PG sensor

 

 

 

 

 

 

 

lever.

 

 

 

CN2 on the

 

1: COPEN

 

Place one lead on pin 2

 

Open: +5 V

control panel

 

2: GND

 

and the other lead on

 

 

(The cover is

board

 

 

 

pin 3. Check the

 

 

open.)

(cover open

 

 

 

resistances while

 

Short: 0 V

sensor)

 

 

 

toggling the cover open

 

 

(The cover is

 

 

 

 

sensor lever.

 

 

closed.)

3-2

Image 32
Contents 659,&0$18$ FCC Compliance Statement For American Users Trademarks Precautions Preface Table of Contents Page Page Product Description Specifications Printing SpecificationsPrint Speed and Printable Columns Character Printable Printing Speed cpsResolution Printing ModePrintable Area Vertical Adjacent Dot Density dpiContinuous Paper EnvelopesPostcards Roll PaperFront Entry Rear Entry Minimum Maximum Paper Feed SpecificationsPaper Specifications Minimum Maximum Front Entry Rear Entry Bottom Entry Min Max Front Entry Bottom Entry Minimum Maximum Interface SpecificationsSoftware Specifications Electrical Specifications Physical SpecificationsEnvironmental Conditions ReliabilityOperation LEDs Color Description LEDsButton Function Error Beep Pattern Paper Release Lever PositionsBeeper Lever Position DescriptionTurning on the Double-strike Mode Special FunctionsPaper Thickness Lever Positions Printing a Self TestSetting Options Using the Bidirectional Adjustment ModeChanging Default Settings Consumables and Options Printing a Hex DumpClearing the Eeprom ConsumablesOperating Principles Overview Printer MechanismPower Supply Circuit Power Supply Circuit OperationBoard Input Voltage Fuse F1 Rating Output Voltage ApplicationsControl Circuit Control Circuit OperationComponent Functions CPU IC2+$375 Troubleshooting Information Print HeadSensors Sensor Test PointsError Conditions MotorsUnit Level Troubleshooting Symptom Problem Description FlowchartFlowchart Abnormal Paper Feeding Abnormal Power Operation Repairing the Power Supply Board Problem Cause Checkpoint SolutionWaveform Repairing the Main Board Assembly Problem Cause Checkpoint Solution15. Waveform Repairing the Printer Mechanism Repairing the Printer MechanismFFC TOP Troubleshooting Disassembly and Assembly Precautions Description SpecificationTools ToolSpecifications for Screws Abbreviation Part NameService Check After Repair Category Item to Question to Answer CheckmarkDisassembly and Assembly Whenever you repair the printer, wipePreparing to Disassemble the Printer Rear tractor tab 1Removing the Panel Board Assembly Removing the Panel Board AssemblyConnecting the Print Head FFCs Removing the Print HeadRemoving the PW Sensor Assembly Removing the HP Sensor10. Installing the PW Sensor Assembly Removing the Ribbon MaskRemoving the Upper Housing Assembly 13. Removing the Upper Housing AssemblyRemoving the Platen Assembly 15. Removing the Platen AssemblyRemoving the Case Open Sensor Assembly Removing the Platen Gear18. Removing the Case Open Sensor Assembly Removing the Printer MechanismConnector Pins CN9Removing the CR Motor Assembly 21. Removing the CR Motor AssemblyRemoving the PF Motor Assembly 22. Removing the PF MotorRemoving the PG Sensor Assembly 23. Removing the PG Sensor AssemblyRemoving the Right Sub Frame Assembly Removing the Right Frame AssemblyDisassembling the Right Frame Assembly $-86701727. Engaging the Right Frame Assembly Gears 1 Removing the Left Frame Assembly 29. Engaging the Tractor Clutch CamRemoving the Ribbon Drive RD Assembly 30. Removing the Left Frame AssemblyRemoving the CR Assembly Tightening torque for the two CBS screws34. Inserting the Timing Belt Removing the Rear PE Sensor Assembly 36. Installing the Rear CR Guide Shaft38. Removing the Front PE Sensor Assembly 39. Removing the Upper Shield Plate and Upper I/F Removing the Power Supply Board Assembly 41. Removing the Power Supply Board AssemblyAdjustments Adjustment Tools Adjustment OverviewRequired Adjustments Adjusting and Resetting the Printer Platen Gap/Parallelism AdjustmentSetting the PG Adjustment Lever Bidirectional Print Alignment Bi-d Adjustment Adjusting the Parallelism of the Carriage Guide ShaftPerforming the Bi-d Adjustment Using the Settings Diskette Destination SettingPerforming the Bi-d Adjustment from the Control Panel Bi-d Adjustment MenuFactory Settings 11. Pitch LightsTPE Level Reset TPE level. Check that the reset value is FF17. Main Menu Adjustments Maintenance Preventive Maintenance Lubrication Name Quantity Availability Part NumberMaintenance Ref. No Lubrication Points Quantity LubricantLubrication Points 1 Appendix Signal Name Function Connector SummaryBoard Connector Function Pins Pin Signal Name Function Table A-8. Connector Pin Assignments − CN9 Table A-13. Connector Pin Assignments − CN14 Circuit Board Component Layout Diagrams Figure A-3. C244 Main Board Component Layout Diagram 2Figure A-4. C166 PSB Board Component Layout Diagram Circuit Board and Exploded Diagrams Page DB1 A t s in k Q 1 , D 5 Page Exploded Diagram for FX-21801 Exploded Diagram for FX-21802 Exploded Diagram for FX-21803