Wall or Rack Mounting Installation, Continued
Rack Mounting
CE Installations
Wiring Requirements
The DNH rack mount configuration is designed for a standard
For installation sites that must conform to CE (Conformite Europeene) Certification see page 23, CE Installations.
The wiring routing and entry requirements for the DNH are dependent upon the site requirements; see page 19, Site Wiring Requirements:
•CE (Conformite Europeene) Certified Area; see Page 23
•NEC Division 2 or
•Cenelec Zone 1 or Zone 2 Areas
•Rack Mounting
18 • Installation |