Site Wiring Requirements
Description
Wiring of Power to DataNET HUB
CE Installations
NEC Div 1, Div 2 or Non Rated Areas
Cenelec Zone 1 or Zone 2 Rated Areas
Non Rated Areas or Rack Mounting
How you wire to the DNH is dependent upon the site requirements:
•CE (Conformite Europeene) Certified Areas
•NEC Division 2 or
•Cenelec Zone 1 or Zone 2 Areas
•Rack Mounting
The installation should have a power disconnect external to HUB enclo- sure.
No voltage dependent selections need to be made on the HUB power supply, as it has a universal input.
See Page 23, CE Installations.
Use Metal Conduit wiring method.
Conductor type: Power cable sized for circuit protection chosen. Use Cable Gland wiring method:
Conductor type: Power cable sized for circuit protection chosen, and must be shielded.
Use Metal Conduit wiring method.
Conductor type: Power cable sized for circuit protection chosen.
Installation • 19 |