DataNET Copper Connections, Continued
Downlink Wiring without | Each of the four downlink connectors (TB15, TB16, TB17, TB18) contain | |
Signal Equalizer Board | wring terminals for two downlink ports; see Figure | |
+ Important | Always ensure that the same port number is used for redundant channel | |
| connections i.e. Channel A to Port 1 on ‘A’ Hub and Channel B to Port 1 | |
| on ‘B’ hub. |
|
|
|
|
| Step | Action |
1.Connect the downlink signal wires to a hub downlink port. Positive to (+) terminal; and Negative to
Master Port
Connectors
TB15 – TB18
2.If conduit is used the cable shield is only terminated at one end of the cable. If shield is terminated at this end connect this shield to GND terminal. If using cable gland connectors, cable gland will always connect the shield to the chassis.
Installation • 33 |