CE Installations
Description | This section should be used for installation sites that must conform to CE |
| (Conformite Europeene) Certification. Typically, this does not apply to |
| installations outside the EC unless the equipment was purchased with |
| the explicit requirements and expectations that it shall conform to EC |
| Electromagnetic and Radio Frequency Interference (EMI/RFI) rejection |
| specifications. |
CE Installation Kit
Instructions
Available from Siemens Applied Automation CE Installation Kit P/N
The following information pertains to CE Installation of General Purpose, Zone 1 and Division 2 Equipment. For Zone 1 Installations, all cabling is terminated in the DNH Zone 1 Enclosure.
Installation with Metallic | The preferred method is to route the field wiring in metallic conduit. If |
Conduit | metallic conduit is used, unshielded power and signal wires can be used. |
| The power and signal wires (DataNET or Ethernet) must be routed in |
| separate conduit. |
| Using flexible conduit and/or armored cable is equivalent to using “steel |
| conduit”. Flexible conduit or armored cable must have its flexible conduit |
| and/or armoring conductivity |
| DNH enclosure (or bulkhead). |
Installation without | If conduit is not used, the following installation practices must be used to |
Metallic Conduit | ensure that the CE certification remains valid: |
| 1. A shielded power cord or cable must be used for the input power |
| wiring. The shield must be terminated at the DNH in a |
| termination at the enclosure (bulkhead); use Siemens Applied Auto- |
| mation P/N |
| equivalent part. For Zone 1 Installation use Siemens Applied Auto- |
| mation P/N |
| 2. The DataNET copper cables shields must be terminated in a 360- |
| degree termination at the enclosure (or bulkhead; use Siemens Ap- |
| plied Automation P/N |
| Kit or an equivalent part). For Zone 1 Installation, use Siemens Ap- |
| plied Automation P/N |
Installation • 23 |