AC Power (Mains) Connections, Continued
Step | Action |
7.Plug the connector back into its base and secure the two recessed captive screws.
8.If using redundant power supplies repeat steps 6 and 7. If not, use connecting wires to parallel connect to the other power supply.
9.Locate the DNH chassis ground lug and connect wire from it to the building’s ground connection.
10.Inspect all connections for shorts or loose connections.
11.You are now ready to connect the DataNET channels; go to page 29.
28 • Installation |