Sterling Plumbing scc2 specifications Pump Copy Screen

Page 28

Figure 12: Pump Copy Screen

Copy to

Pump

2

Last

Pump

2

Last

Pump

2

Follow the directions below to copy settings to one other station, a range of stations, or all stations:

Copying to One Other Pump:

1.On the “Pump Copy” screen (Figure 12), touch the gray Copy to Pump button. The keypad pops up.

2.Enter the pump number for the station you are copying to. Use (Backspace

Key) to erase any mistakes. Use (Enter Key) to enter the value. The keypad disappears, and the “Pump Copy” screen shows the pump number you entered.

3.Touch the green Copy to Single Pump button. Complete briefly appears on the screen.

4.As appropriate, either continue copying to other pumps, or touch Return to go back to the “Pump Setup” screen.

Copying to the Other Pump:

1.On the “Pump Copy” screen (

2–Pump 20-Station Controllers

Installation

23 of 51

Image 28
Contents SCC 2-Pump 20-Station Controllers Parts and Service Department Shipping Information Warranty Returns Credit ReturnsTable of Contents Safety Restoring a LOST/CORRUPT PROGRAM...380 How to Use This Manual SafetySafety Symbols Used in this Manual Controller Safety Tags Wear Safety Glasses and Work GlovesSafety Devices and Interlocks Safety Circuit StandardsSafety Device Lock-Outs Fail Safe OperationGeneral Responsibility ResponsibilityOperator Responsibility Maintenance Responsibility Reporting a Safety DefectStandard Features Functional DescriptionModels Covered in This Manual General DescriptionOptional Features Controller FeaturesUncrating InstallationMounting the Control Panel Pump 20 Station Controller with 6 Display Controller Identification Serial Number Tag Located on the side of the controller boxMaking Control Panel Power Drop Wiring Connections Connecting the Control Panel to Vacuum HoppersConnecting the Control Panel to the Pump Package Electrical ConnectionsSetting the Number of Stations and the Number of Pumps Set-upMenu Screen Setting Up Alarm Duration System Setup ScreenSetting Up Pump Staging Setting Up Touch Switch DelaySetting Up Stations Setting Up a Single StationStation Setup Screen Copying Settings from One Station to OthersStation Copy Screen Setting Up Pumps Setting Up a Single PumpPump Setup Screen Copying Settings from One Pump to the OtherPump Copy Screen Setup Password Finishing Setup Setting Up PasswordsOperator Password Page Initial Startup Operation OverviewBasic Tasks Reviewing Station StatusReviewing Pump Status Pump Status Screen During OperationPassword Entry Screen Logging On and Logging OffEnabling and Disabling Stations and Pumps Reviewing and Adjusting Basic Station Settings Starting and Stopping the SystemAdjusting Convey Time and Dump Delay Navigating Among the Station Operator ScreensReviewing and Resetting a Pump Hour Meter Adjusting Advanced SettingsActivating and Stopping Priority Convey for a Station Transferring Stations to a Standby Pump Transfer To Standby Pump Screen Standby Pump Errors AlarmsReviewing Alarms Alarm Log Screen Silencing AlarmsRestoring a Lost or Corrupt Program Corrective MaintenancePLC Memory Module Page Configurable Settings/Defaults Station Setup Factory PresetsPump 20-Station Controllers Configurable Settings/Defaults Pump Setup Factory Presets Idle Time OptionsTroubleshooting General TroubleshootingPump Alarms Station AlarmsSystem Alarms Drawings and Diagrams WarrantyAppendix AC Voltage Spare Parts ListDC Voltage Service Department Technical Assistance Contact InformationParts Department Sales Department