Sterling Plumbing scc2 specifications Menu Screen

Page 20

Figure 3: “Menu” Screen

2.At the “Menu” screen, (Figure 3), touch the System Setup button. The “System Setup” screen opens.

Figure 4: “System Setup” Screen Before Setup

Stations

19-20

3.At the “System Setup” screen, (Figure 4), touch Stations Present. A keypad pops up.

4.Enter the total number of stations (1-20) to be controlled by the system. Use

(Backspace Key) to erase any mistakes. Use (Enter Key) to enter the value. The keypad disappears, and the new setting appears under Stations Present.

5.Touch Pumps Present. A keypad pops up.

2–Pump 20-Station Controllers

Installation

15 of 51

Image 20
Contents SCC 2-Pump 20-Station Controllers Parts and Service Department Shipping Information Warranty Returns Credit ReturnsTable of Contents Safety Restoring a LOST/CORRUPT PROGRAM...380 Safety Symbols Used in this Manual SafetyHow to Use This Manual Controller Safety Tags Wear Safety Glasses and Work GlovesSafety Devices and Interlocks Safety Circuit StandardsSafety Device Lock-Outs Fail Safe OperationOperator Responsibility ResponsibilityGeneral Responsibility Maintenance Responsibility Reporting a Safety DefectStandard Features Functional DescriptionModels Covered in This Manual General DescriptionOptional Features Controller FeaturesMounting the Control Panel InstallationUncrating Pump 20 Station Controller with 6 Display Controller Identification Serial Number Tag Located on the side of the controller boxMaking Control Panel Power Drop Wiring Connections Connecting the Control Panel to Vacuum HoppersConnecting the Control Panel to the Pump Package Electrical ConnectionsSetting the Number of Stations and the Number of Pumps Set-upMenu Screen Setting Up Alarm Duration System Setup ScreenSetting Up Pump Staging Setting Up Touch Switch DelaySetting Up Stations Setting Up a Single StationStation Setup Screen Copying Settings from One Station to OthersStation Copy Screen Setting Up Pumps Setting Up a Single PumpPump Setup Screen Copying Settings from One Pump to the OtherPump Copy Screen Operator Password Finishing Setup Setting Up PasswordsSetup Password Page Initial Startup Operation OverviewBasic Tasks Reviewing Station StatusReviewing Pump Status Pump Status Screen During OperationPassword Entry Screen Logging On and Logging OffEnabling and Disabling Stations and Pumps Reviewing and Adjusting Basic Station Settings Starting and Stopping the SystemAdjusting Convey Time and Dump Delay Navigating Among the Station Operator ScreensActivating and Stopping Priority Convey for a Station Adjusting Advanced SettingsReviewing and Resetting a Pump Hour Meter Transferring Stations to a Standby Pump Transfer To Standby Pump Screen Reviewing Alarms AlarmsStandby Pump Errors Alarm Log Screen Silencing AlarmsPLC Memory Module Corrective MaintenanceRestoring a Lost or Corrupt Program Page Configurable Settings/Defaults Station Setup Factory PresetsPump 20-Station Controllers Configurable Settings/Defaults Pump Setup Factory Presets Idle Time OptionsTroubleshooting General TroubleshootingSystem Alarms Station AlarmsPump Alarms Appendix WarrantyDrawings and Diagrams DC Voltage Spare Parts ListAC Voltage Service Department Technical Assistance Contact InformationParts Department Sales Department