Sterling Plumbing scc2 specifications Setting Up Pumps, Setting Up a Single Pump

Page 26

value. The keypad disappears, and the “Station Copy” screen shows the station number you entered under Last Station.

5.Touch the green Copy to Range of Stations button. Complete briefly appears on the screen.

6.As appropriate, either continue copying to other stations, or touch Return to go back to the “Station Setup” screen.

Copying to All Other Stations:

1.On the “Station Copy” screen (Figure 9), touch the green Copy to All Stations button. Complete briefly appears on the screen.

2.Touch Return to go back to the “Station Setup” screen.

Setting Up Pumps

Before starting the system, you must define several settings for each pump, such as how quickly to shut it down when it is not in use. This section first discusses how to use the controller’s menu system to configure pumps. The table on page 422 discusses the individual choices.

Setting Up a Single Pump

1.Go to the “Pump Status“ screen if needed. To reach this screen from any other screen, touch Menu on the right-hand side of the screen, and then touch Pumps. The “Pump Status” screen appears:

Figure 10: “Pump Status” Screen

Stations

19-20

2.Touch the icon for the pump you want to set up, and hold it for several seconds. The “Pump Setup” screen opens.

2–Pump 20-Station Controllers

Installation

21 of 51

Image 26
Contents SCC 2-Pump 20-Station Controllers Parts and Service Department Shipping Information Warranty Returns Credit ReturnsTable of Contents Safety Restoring a LOST/CORRUPT PROGRAM...380 Safety Symbols Used in this Manual SafetyHow to Use This Manual Controller Safety Tags Wear Safety Glasses and Work GlovesSafety Device Lock-Outs Safety Devices and InterlocksSafety Circuit Standards Fail Safe OperationOperator Responsibility ResponsibilityGeneral Responsibility Maintenance Responsibility Reporting a Safety DefectModels Covered in This Manual Standard FeaturesFunctional Description General DescriptionOptional Features Controller FeaturesMounting the Control Panel InstallationUncrating Pump 20 Station Controller with 6 Display Controller Identification Serial Number Tag Located on the side of the controller boxConnecting the Control Panel to the Pump Package Making Control Panel Power Drop Wiring ConnectionsConnecting the Control Panel to Vacuum Hoppers Electrical ConnectionsSetting the Number of Stations and the Number of Pumps Set-upMenu Screen Setting Up Alarm Duration System Setup ScreenSetting Up Pump Staging Setting Up Touch Switch DelaySetting Up Stations Setting Up a Single StationStation Setup Screen Copying Settings from One Station to OthersStation Copy Screen Setting Up Pumps Setting Up a Single PumpPump Setup Screen Copying Settings from One Pump to the OtherPump Copy Screen Operator Password Finishing Setup Setting Up PasswordsSetup Password Page Initial Startup Basic Tasks OperationOverview Reviewing Station StatusReviewing Pump Status Pump Status Screen During OperationPassword Entry Screen Logging On and Logging OffEnabling and Disabling Stations and Pumps Reviewing and Adjusting Basic Station Settings Starting and Stopping the SystemAdjusting Convey Time and Dump Delay Navigating Among the Station Operator ScreensActivating and Stopping Priority Convey for a Station Adjusting Advanced SettingsReviewing and Resetting a Pump Hour Meter Transferring Stations to a Standby Pump Transfer To Standby Pump Screen Reviewing Alarms AlarmsStandby Pump Errors Alarm Log Screen Silencing AlarmsPLC Memory Module Corrective MaintenanceRestoring a Lost or Corrupt Program Page Configurable Settings/Defaults Station Setup Factory PresetsPump 20-Station Controllers Configurable Settings/Defaults Pump Setup Factory Presets Idle Time OptionsTroubleshooting General TroubleshootingSystem Alarms Station AlarmsPump Alarms Appendix WarrantyDrawings and Diagrams DC Voltage Spare Parts ListAC Voltage Parts Department Service DepartmentTechnical Assistance Contact Information Sales Department