Sterling Plumbing scc2 specifications Initial Startup

Page 31

to enter the value. The keypad disappears, and the “System Setup” screen shows the new setting.

3-6 Initial Startup

Once you have finished all the setup described above, you are ready to start the system. To start your system, complete the following steps.

1.At any screen, touch Menu on the right side of the screen. The “Menu” screen appears (Figure 3).

2.Touch Stations. The “Station Status” screen appears (Figure 6).

3.For each station that you want to use, briefly touch its icon. The icon turns blue, indicating that the station is ready, or the icon turns yellow, indicating that the station needs material.

4.Touch Pumps. The “Pump Status” screen opens (Figure 10)

5.For each pump that you want to use, briefly touch its icon. The icon turns blue, indicating that the pump is ready.

6.Touch Push to Start System in the lower right-hand corner of the screen.

7.The system starts. If any alarm messages appear on the screen, see p. 436.

Hopper Loaders with/without Sight Glasses

26

Image 31
Contents SCC 2-Pump 20-Station Controllers Parts and Service Department Shipping Information Credit Returns Warranty ReturnsTable of Contents Safety Restoring a LOST/CORRUPT PROGRAM...380 How to Use This Manual SafetySafety Symbols Used in this Manual Wear Safety Glasses and Work Gloves Controller Safety TagsFail Safe Operation Safety Devices and InterlocksSafety Circuit Standards Safety Device Lock-OutsGeneral Responsibility ResponsibilityOperator Responsibility Reporting a Safety Defect Maintenance ResponsibilityGeneral Description Standard FeaturesFunctional Description Models Covered in This ManualController Features Optional FeaturesUncrating InstallationMounting the Control Panel Pump 20 Station Controller with 6 Display Located on the side of the controller box Controller Identification Serial Number TagElectrical Connections Making Control Panel Power Drop Wiring ConnectionsConnecting the Control Panel to Vacuum Hoppers Connecting the Control Panel to the Pump PackageSet-up Setting the Number of Stations and the Number of PumpsMenu Screen System Setup Screen Setting Up Alarm DurationSetting Up Touch Switch Delay Setting Up Pump StagingSetting Up a Single Station Setting Up StationsCopying Settings from One Station to Others Station Setup ScreenStation Copy Screen Setting Up a Single Pump Setting Up PumpsCopying Settings from One Pump to the Other Pump Setup ScreenPump Copy Screen Setup Password Finishing Setup Setting Up PasswordsOperator Password Page Initial Startup Reviewing Station Status OperationOverview Basic TasksPump Status Screen During Operation Reviewing Pump StatusLogging On and Logging Off Password Entry ScreenEnabling and Disabling Stations and Pumps Starting and Stopping the System Reviewing and Adjusting Basic Station SettingsNavigating Among the Station Operator Screens Adjusting Convey Time and Dump DelayReviewing and Resetting a Pump Hour Meter Adjusting Advanced SettingsActivating and Stopping Priority Convey for a Station Transferring Stations to a Standby Pump Transfer To Standby Pump Screen Standby Pump Errors AlarmsReviewing Alarms Silencing Alarms Alarm Log ScreenRestoring a Lost or Corrupt Program Corrective MaintenancePLC Memory Module Page Station Setup Factory Presets Configurable Settings/DefaultsPump 20-Station Controllers Configurable Settings/Defaults Idle Time Options Pump Setup Factory PresetsGeneral Troubleshooting TroubleshootingPump Alarms Station AlarmsSystem Alarms Drawings and Diagrams WarrantyAppendix AC Voltage Spare Parts ListDC Voltage Sales Department Service DepartmentTechnical Assistance Contact Information Parts Department