Sterling Plumbing scc2 Set-up, Setting the Number of Stations and the Number of Pumps

Page 19

5.On 115 VAC control voltage systems, run a common hot (115 VAC) wire and a common neutral wire from the controller to each pump package in the system.

On 24 VDC control voltage systems, run a common +24 VDC wire and a common 0 (zero) VDC wire from the controller to each pump package in the system.

Note: Reference “Mechanical Components Operation and Installation manual” for more details on component locations (manual part # A0536580).

3-5 Set-up

This section provides the procedures for configuring your 2-pump, 20- station controller.

Configuration of your controller includes setting the number of stations and pumps, setting variables such as convey time and blow-back interval, and setting up passwords. We recommend that you carry out these procedures in the order given here.

Note: Before carrying out these procedures, install all equipment as described in this section and in the Mechanical Components manual.

Setting the Number of Stations and the Number of Pumps

Figure 2: Default “Station Status” Screen Before Setup

1.At the “Station Status” screen (Figure 2) or at the “Pump Status” screen, touch the Menu button. The “Menu” screen opens.

Hopper Loaders with/without Sight Glasses

14

Image 19
Contents SCC 2-Pump 20-Station Controllers Parts and Service Department Shipping Information Credit Returns Warranty ReturnsTable of Contents Safety Restoring a LOST/CORRUPT PROGRAM...380 How to Use This Manual SafetySafety Symbols Used in this Manual Wear Safety Glasses and Work Gloves Controller Safety TagsFail Safe Operation Safety Devices and InterlocksSafety Circuit Standards Safety Device Lock-OutsGeneral Responsibility ResponsibilityOperator Responsibility Reporting a Safety Defect Maintenance ResponsibilityGeneral Description Standard FeaturesFunctional Description Models Covered in This ManualController Features Optional FeaturesUncrating InstallationMounting the Control Panel Pump 20 Station Controller with 6 Display Located on the side of the controller box Controller Identification Serial Number TagElectrical Connections Making Control Panel Power Drop Wiring ConnectionsConnecting the Control Panel to Vacuum Hoppers Connecting the Control Panel to the Pump PackageSet-up Setting the Number of Stations and the Number of PumpsMenu Screen System Setup Screen Setting Up Alarm DurationSetting Up Touch Switch Delay Setting Up Pump StagingSetting Up a Single Station Setting Up StationsCopying Settings from One Station to Others Station Setup ScreenStation Copy Screen Setting Up a Single Pump Setting Up PumpsCopying Settings from One Pump to the Other Pump Setup ScreenPump Copy Screen Setup Password Finishing Setup Setting Up PasswordsOperator Password Page Initial Startup Reviewing Station Status OperationOverview Basic TasksPump Status Screen During Operation Reviewing Pump StatusLogging On and Logging Off Password Entry ScreenEnabling and Disabling Stations and Pumps Starting and Stopping the System Reviewing and Adjusting Basic Station SettingsNavigating Among the Station Operator Screens Adjusting Convey Time and Dump DelayReviewing and Resetting a Pump Hour Meter Adjusting Advanced SettingsActivating and Stopping Priority Convey for a Station Transferring Stations to a Standby Pump Transfer To Standby Pump Screen Standby Pump Errors AlarmsReviewing Alarms Silencing Alarms Alarm Log ScreenRestoring a Lost or Corrupt Program Corrective MaintenancePLC Memory Module Page Station Setup Factory Presets Configurable Settings/DefaultsPump 20-Station Controllers Configurable Settings/Defaults Idle Time Options Pump Setup Factory PresetsGeneral Troubleshooting TroubleshootingPump Alarms Station AlarmsSystem Alarms Drawings and Diagrams WarrantyAppendix AC Voltage Spare Parts ListDC Voltage Sales Department Service DepartmentTechnical Assistance Contact Information Parts Department