Sterling Plumbing scc2 specifications Credit Returns, Warranty Returns

Page 4

Credit Returns

Prior to the return of any material, authorization must be given by the manufacturer. A RMS number will be assigned for the equipment to be returned.

Reason for requesting the return must be given.

All returned material purchased from the manufacturer is subject to 15% ($75.00 minimum) restocking charge.

All returns are to be shipped prepaid.

The invoice number and date or purchase order number and date must be supplied.

No credit will be issued for material that is not within the manufacturer’s warranty period and/or in new and unused condition, suitable for resale.

Warranty Returns

Prior to the return of any material, authorization must be given by the manufacturer. A RMS number will be assigned for the equipment to be returned.

Reason for requesting the return must be given. All returns are to be shipped prepaid.

The invoice number and date or purchase order number and date must be supplied.

After inspecting the material, a replacement or credit will be given, at the manufacturer’s discretion, if the item is found to be defective in materials or workmanship. Purchased components are covered under their specific warranty terms.

2-Pump 20-Station Controllers

iii

Image 4
Contents SCC 2-Pump 20-Station Controllers Parts and Service Department Shipping Information Warranty Returns Credit ReturnsTable of Contents Safety Restoring a LOST/CORRUPT PROGRAM...380 How to Use This Manual SafetySafety Symbols Used in this Manual Controller Safety Tags Wear Safety Glasses and Work GlovesSafety Devices and Interlocks Safety Circuit StandardsSafety Device Lock-Outs Fail Safe OperationGeneral Responsibility ResponsibilityOperator Responsibility Maintenance Responsibility Reporting a Safety DefectStandard Features Functional DescriptionModels Covered in This Manual General DescriptionOptional Features Controller FeaturesUncrating InstallationMounting the Control Panel Pump 20 Station Controller with 6 Display Controller Identification Serial Number Tag Located on the side of the controller boxMaking Control Panel Power Drop Wiring Connections Connecting the Control Panel to Vacuum HoppersConnecting the Control Panel to the Pump Package Electrical ConnectionsSetting the Number of Stations and the Number of Pumps Set-upMenu Screen Setting Up Alarm Duration System Setup ScreenSetting Up Pump Staging Setting Up Touch Switch DelaySetting Up Stations Setting Up a Single StationStation Setup Screen Copying Settings from One Station to OthersStation Copy Screen Setting Up Pumps Setting Up a Single PumpPump Setup Screen Copying Settings from One Pump to the OtherPump Copy Screen Setup Password Finishing Setup Setting Up PasswordsOperator Password Page Initial Startup Operation OverviewBasic Tasks Reviewing Station StatusReviewing Pump Status Pump Status Screen During OperationPassword Entry Screen Logging On and Logging OffEnabling and Disabling Stations and Pumps Reviewing and Adjusting Basic Station Settings Starting and Stopping the SystemAdjusting Convey Time and Dump Delay Navigating Among the Station Operator ScreensReviewing and Resetting a Pump Hour Meter Adjusting Advanced SettingsActivating and Stopping Priority Convey for a Station Transferring Stations to a Standby Pump Transfer To Standby Pump Screen Standby Pump Errors AlarmsReviewing Alarms Alarm Log Screen Silencing AlarmsRestoring a Lost or Corrupt Program Corrective MaintenancePLC Memory Module Page Configurable Settings/Defaults Station Setup Factory PresetsPump 20-Station Controllers Configurable Settings/Defaults Pump Setup Factory Presets Idle Time OptionsTroubleshooting General TroubleshootingPump Alarms Station AlarmsSystem Alarms Drawings and Diagrams WarrantyAppendix AC Voltage Spare Parts ListDC Voltage Service Department Technical Assistance Contact InformationParts Department Sales Department