Sterling Plumbing scc2 specifications Table of Contents

Page 5

Table of Contents

Hopper Loaders with/without Sight Glasses

iv

Image 5
Contents SCC 2-Pump 20-Station Controllers Parts and Service Department Shipping Information Credit Returns Warranty ReturnsTable of Contents Safety Restoring a LOST/CORRUPT PROGRAM...380 Safety Symbols Used in this Manual SafetyHow to Use This Manual Wear Safety Glasses and Work Gloves Controller Safety TagsSafety Circuit Standards Safety Devices and InterlocksSafety Device Lock-Outs Fail Safe OperationOperator Responsibility ResponsibilityGeneral Responsibility Reporting a Safety Defect Maintenance ResponsibilityFunctional Description Standard FeaturesModels Covered in This Manual General DescriptionController Features Optional FeaturesMounting the Control Panel InstallationUncrating Pump 20 Station Controller with 6 Display Located on the side of the controller box Controller Identification Serial Number TagConnecting the Control Panel to Vacuum Hoppers Making Control Panel Power Drop Wiring ConnectionsConnecting the Control Panel to the Pump Package Electrical ConnectionsSet-up Setting the Number of Stations and the Number of PumpsMenu Screen System Setup Screen Setting Up Alarm DurationSetting Up Touch Switch Delay Setting Up Pump StagingSetting Up a Single Station Setting Up StationsCopying Settings from One Station to Others Station Setup ScreenStation Copy Screen Setting Up a Single Pump Setting Up PumpsCopying Settings from One Pump to the Other Pump Setup ScreenPump Copy Screen Operator Password Finishing Setup Setting Up PasswordsSetup Password Page Initial Startup Overview OperationBasic Tasks Reviewing Station StatusPump Status Screen During Operation Reviewing Pump StatusLogging On and Logging Off Password Entry ScreenEnabling and Disabling Stations and Pumps Starting and Stopping the System Reviewing and Adjusting Basic Station SettingsNavigating Among the Station Operator Screens Adjusting Convey Time and Dump DelayActivating and Stopping Priority Convey for a Station Adjusting Advanced SettingsReviewing and Resetting a Pump Hour Meter Transferring Stations to a Standby Pump Transfer To Standby Pump Screen Reviewing Alarms AlarmsStandby Pump Errors Silencing Alarms Alarm Log ScreenPLC Memory Module Corrective MaintenanceRestoring a Lost or Corrupt Program Page Station Setup Factory Presets Configurable Settings/DefaultsPump 20-Station Controllers Configurable Settings/Defaults Idle Time Options Pump Setup Factory PresetsGeneral Troubleshooting TroubleshootingSystem Alarms Station AlarmsPump Alarms Appendix WarrantyDrawings and Diagrams DC Voltage Spare Parts ListAC Voltage Technical Assistance Contact Information Service DepartmentParts Department Sales Department