Motorola I580 service manual Remove Main Board, Keypad

Page 68

PREPARING FOR FIELD LEVEL TESTING: Remove Main Board, Keypad

7.13Remove Main Board, Keypad

Tools: Black Stick, Tweezers.

7.13.1Remove:

1.Wedge black stick under flip flex connector. Gently pry upwards along length until release.

2.Lift main board straight up from housing bosses.

3.Remove the housing keypad backer.

4.Lift Keypad straight up from housing frame

5.Clean around keypad holes. Replace keypad if worn or dirty

1

Housing Bosses

4

Figure 7-7.

68P80401P05

53

Image 68
Contents IDEN Digital Multi-Service, Data-Capable Portable I580 Manual Revisions Safety and General Information Electro Magnetic Interference Compatibility Medical DevicesAccessory Safety Information Cleaning and Drying ConsiderationsSafety and General Information Model Information Model Numbering SystemModel Specifications General Receiver TransmitterContents Chapter Basic Level Test Modes and Procedures Chapter Field Level Test Modes and Procedures Appendix a Ordering Replacement Parts and Kits How This Manual Is Organized PrefaceWho Should Use This Manual Conventions Used in This Manual Related PublicationsOverview IDEN Digital Modulation TechnologySpectrum of iDEN Quad 16QAM IDEN Voice Compression Technology RF Transmission BurstsCalling Area Coverage MOTOtalk Bluetooth Wireless SystemGlobal Positioning System GPS Section To remove a SIM card Figure SIM CardsRemoving and Inserting a SIM Card Removing a SIM Card To insert a SIM card FigureFEATURES, ICONS, and Indicators I580 FeaturesDisplay Icons Main Menu IconsStatus Icons Power-Up Sequence DISPLAYS, MESSAGES, and AlertsPower-Down Sequence Self-Test ErrorsSelf-Test Reset Errors MessagesService Messages Service MessagesAlert Tones Alert TonesAlert Tones Alert Tones To set unit to vibrate for all calls Using the Optional Vibrate FunctionVibrator Settings From the main menu, select Settings 2-Way Radio Alert Type Preparing for Basic Level Testing Reference AccessoriesTest Equipment Reference UnitReset Condition Basic Level Checks and Self TestsCustomer Care Test ConditionsBasic-Level Test Checklist Preventive MaintenanceBasic-Level Test Checklist To clean the unit takes approximately 3 minutesMechanical and Electrical Checks SIM Card Swap TestShock and Pressure test time is approximately 3 minutes SIM Card Swap test time is approximately 5 minutesAccessory Swap Test Accessory Swap test time is approximately 5 minutesLockup Test Lockup Test time is approximately 6 minutesBattery Connections Test Testing the GPS ReceiverBattery Connections test time is approximately 5 minutes To test the GPS ReceiverVoltage Recognition test time is approximately 4 minutes Self-Test ProceduresVoltage Recognition Test Passcode test time is approximately 5 minutes Programming Menu Settings CheckPasscode Test From the main menu, select Settings Display/Info Contrast Phone Calls FeaturesWay Radio Options Personalize Volume FeaturesSecurity Features From the main menu, select Settings Security GPS PIN Advanced Features Call Performance TestCall Performance test time is approximately 7 minutes Basic Level Test Modes and Procedures Entering Debug ModeTo enter Debug/Trace Mode Test ModesTrace Mode Display Screens Display ScreensGPS Test Mode Test Procedures Entering Test ModeTo enter Test Mode Audio Loopback TestESN and Imei Matching Test Debug CheckAudio Loopback test time is approximately 3 minutes ESN/IMEI Matching test time is approximately 6 minutesTo monitor the data in the unit 68P80401P05 Technician Test Procedures Connecting the Unit to the RSS Workstation Programming the i580 UnitCodeplug Help Codeplug TroubleshootingTo access the codeplug Help topic in Windows Preparing for Field Level Testing Preparing Equipment for TestingUsing RSS Connecting an iDEN Unit to the R-2660Typical R-2660 Setup To connect the unit to the R-2660RF Zone Fields and Values To enter Initial Registration modeOperating the R-2660 Disassembling and Reassembling the Unit Disassembly Sequence FlowchartAssembly/Disassembly Procedures Remove Remove Battery CoverInstall Remove Battery Remove SIM Card Remove AntennaPreparing for Field Level Testing Remove Antenna Remove Back Housing Remove Main Board, Keypad Remove Flip Assembly Procedure to remove flip assemblyPreparing for Field Level Testing Remove Flip Assembly Install Flip Assembly Procedure to install flip assemblyPreparing for Field Level Testing Install Flip Assembly Exploded View and Parts List I580 Component Parts ListI580 Exploded View Field Level Test Modes and Procedures Field-Level Test Checklist Required Test EquipmentField-Level Test Checklist Done Technical Tests Pass FailSee the Strong Signal Environment section Registration/Call TestSignal Quality Error SQE Test R-2660TX Power Test See Entering Test Mode Press Menu, EditBit Error Rate BER Test PassPower-Up Test Keypad Test Audio Test Use this test to check the audio portion of the unitReset Test ResetReset Log Test To perform the reset log testModel Assembly MA Test Mode Test GPS Global Positioning System Receiver Test Use this test on a unit to check its GPS functionalityYes Bluetooth Test This Page intentionally left blank Mechanical Parts Rework and Repair Recommended EquipmentRework/Repair Requirements Recommended ToolsRecommended Supplies Board Preparation Components IdentificationMechanical Parts Rework Procedure Removal ProcedureLand Preparation Procedure Installation Procedure5 J752 Audio Jack 4 J600 RF Connector6 J401 30 Pin Board-to-Flex Connector 9 M105 Battery Contact 7 J400 80 Pin Board-to Flex Connector8 M002 Simm Connector 11 J753 Microphone Socket SW-all Key/Switch10 M2 2 Pin-Contact 13 D401 through D412 LED Ordering Replacement Parts and Kits Customer ServiceReplacement Parts Domestic OrdersReplacement Kits Table A-1Mid Rate Travel Chargers Bluetooth Accessories NNTN2344 NA Recommended Test Equipment and Tools Recommended Programming EquipmentTable A-2. Recommended Test Equipment and Tools Table A-3. Recommended Programming EquipmentTable A-4. Recommended Software TTY@68P80401P05@
Related manuals
Manual 222 pages 58.9 Kb