Motorola I580 service manual Signal Quality Error SQE Test, R-2660

Page 79

FIELD LEVEL TEST MODES AND PROCEDURES: Signal Quality Error (SQE) Test

8.5Signal Quality Error (SQE) Test

Use this test on a unit having any of the following symptoms: No service failures or poor SQE/RSSI (poor performance in known good coverage area).

Set up the R-2660 for iDEN

Mobile operation, and connect the

unit to the RF IN/OUT

connector. See Figure 7-1 on page

7-3.

Notes:

1.Watch unit for resetting during this procedure.

2.Master reset can be completed on the unit by pressing Menu, Settings, Security.

3.Registration and calls might take over 1 minute to complete.

4.See the Strong Signal Environment section in Chapter 7.

 

 

Connect the regulated battery

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

eliminator to the unit to be

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

tested. Set the power supply 7.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Vdc.

 

 

 

 

Power

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

up the unit. Enter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Initial Registration mode (see

Fail

 

 

 

Perform the Registra-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pass

Operating

the R-2660.)

Press Start.

 

 

 

 

 

 

 

tion/Call test.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The Call

SEQ: 1 thru 6 lights up

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

when unit has

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Verify that

 

 

 

registered.

 

 

 

 

 

 

 

 

 

 

 

 

 

the unit can complete an

 

 

 

 

 

 

 

 

 

 

 

SQE Reference Chart

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

interconnect call. Press End/Home

 

 

 

 

 

 

 

 

 

 

 

 

Gen

SQE Level

 

until the unit displays Ready. Press Intercon-

 

 

 

 

 

 

 

 

 

 

Fail

 

 

 

 

 

 

 

 

 

 

 

nect (3:1 or 6:1) and Start on the R-2660. Wait

 

for the

 

 

 

-70 dBm

>26

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

green LED to light. Press Send on the unit.

 

 

 

 

 

 

 

 

 

-80 dBm

>25

 

 

 

 

 

Note: Leave call connected for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the next test.

 

 

 

 

Perform the

 

 

 

-90 dBm

>23

 

 

 

 

 

 

 

 

 

 

 

 

Registration/Call test.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-100 dBm

>20

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pass

Place unit

in Debug Mode (see

Entering Debug Mode). Press

Trace to monitor the SQE & TX level. Fail Press RF in the R-2660 and arrow down to Gen:.

Verify that it is set to -70dBm.

Verify that the SQE is

greater than

26.

Pass

Note: Gen levels in the SQE chart include RF Adapter losses.

Replace the

Main board.

Change

Gen: to -80 dBm, and

check the SQE Reference chart to

 

 

Fail

 

 

 

 

 

 

 

 

 

 

 

 

verify the unit’s SQE per Gen:

 

 

 

 

 

 

 

 

output using the

 

 

 

 

 

 

 

 

 

 

 

chart.

 

 

Unit passed test. Look for

 

 

 

 

 

 

 

 

Pass

 

 

 

 

 

system, coverage, accessory, or

 

 

 

 

 

 

 

software problems.

 

 

 

 

 

 

 

 

 

 

 

 

 

Replace the Main board.

64

68P80401P05

Image 79
Contents IDEN Digital Multi-Service, Data-Capable Portable I580 Manual Revisions Safety and General Information Medical Devices Electro Magnetic Interference CompatibilityCleaning and Drying Considerations Accessory Safety InformationSafety and General Information Model Numbering System Model InformationGeneral Receiver Transmitter Model SpecificationsContents Chapter Basic Level Test Modes and Procedures Chapter Field Level Test Modes and Procedures Appendix a Ordering Replacement Parts and Kits Who Should Use This Manual PrefaceHow This Manual Is Organized Related Publications Conventions Used in This ManualIDEN Digital Modulation Technology OverviewSpectrum of iDEN Quad 16QAM RF Transmission Bursts IDEN Voice Compression TechnologyCalling Area Coverage Global Positioning System GPS Section Bluetooth Wireless SystemMOTOtalk Removing and Inserting a SIM Card SIM CardsTo remove a SIM card Figure To insert a SIM card Figure Removing a SIM CardI580 Features FEATURES, ICONS, and IndicatorsMain Menu Icons Display IconsStatus Icons DISPLAYS, MESSAGES, and Alerts Power-Up SequenceMessages Power-Down SequenceSelf-Test Errors Self-Test Reset ErrorsService Messages Service MessagesAlert Tones Alert TonesAlert Tones Alert Tones Vibrator Settings Using the Optional Vibrate FunctionTo set unit to vibrate for all calls From the main menu, select Settings 2-Way Radio Alert Type Reference Unit Preparing for Basic Level TestingReference Accessories Test EquipmentTest Conditions Reset ConditionBasic Level Checks and Self Tests Customer CareTo clean the unit takes approximately 3 minutes Basic-Level Test ChecklistPreventive Maintenance Basic-Level Test ChecklistSIM Card Swap test time is approximately 5 minutes Mechanical and Electrical ChecksSIM Card Swap Test Shock and Pressure test time is approximately 3 minutesLockup Test time is approximately 6 minutes Accessory Swap TestAccessory Swap test time is approximately 5 minutes Lockup TestTo test the GPS Receiver Battery Connections TestTesting the GPS Receiver Battery Connections test time is approximately 5 minutesVoltage Recognition Test Self-Test ProceduresVoltage Recognition test time is approximately 4 minutes Passcode Test Programming Menu Settings CheckPasscode test time is approximately 5 minutes Phone Calls Features From the main menu, select Settings Display/Info ContrastWay Radio Options Security Features Volume FeaturesPersonalize From the main menu, select Settings Security GPS PIN Call Performance Test Advanced FeaturesCall Performance test time is approximately 7 minutes Test Modes Basic Level Test Modes and ProceduresEntering Debug Mode To enter Debug/Trace ModeDisplay Screens Trace Mode Display ScreensGPS Audio Loopback Test Test Mode Test ProceduresEntering Test Mode To enter Test ModeESN/IMEI Matching test time is approximately 6 minutes ESN and Imei Matching TestDebug Check Audio Loopback test time is approximately 3 minutesTo monitor the data in the unit 68P80401P05 Technician Test Procedures Programming the i580 Unit Connecting the Unit to the RSS WorkstationTo access the codeplug Help topic in Windows Codeplug TroubleshootingCodeplug Help Preparing Equipment for Testing Preparing for Field Level TestingConnecting an iDEN Unit to the R-2660 Using RSSTo connect the unit to the R-2660 Typical R-2660 SetupOperating the R-2660 To enter Initial Registration modeRF Zone Fields and Values Assembly/Disassembly Procedures Disassembly Sequence FlowchartDisassembling and Reassembling the Unit Install Remove Battery CoverRemove Remove Battery Remove Antenna Remove SIM CardPreparing for Field Level Testing Remove Antenna Remove Back Housing Remove Main Board, Keypad Procedure to remove flip assembly Remove Flip AssemblyPreparing for Field Level Testing Remove Flip Assembly Procedure to install flip assembly Install Flip AssemblyPreparing for Field Level Testing Install Flip Assembly I580 Component Parts List Exploded View and Parts ListI580 Exploded View Field Level Test Modes and Procedures Required Test Equipment Field-Level Test ChecklistDone Technical Tests Pass Fail Field-Level Test ChecklistRegistration/Call Test See the Strong Signal Environment sectionR-2660 Signal Quality Error SQE TestSee Entering Test Mode Press Menu, Edit TX Power TestPass Bit Error Rate BER TestPower-Up Test Keypad Test Use this test to check the audio portion of the unit Audio TestReset Reset TestTo perform the reset log test Reset Log TestModel Assembly MA Test Mode Test Use this test on a unit to check its GPS functionality GPS Global Positioning System Receiver TestYes Bluetooth Test This Page intentionally left blank Recommended Equipment Mechanical Parts Rework and RepairRecommended Supplies Recommended ToolsRework/Repair Requirements Components Identification Board PreparationInstallation Procedure Mechanical Parts Rework ProcedureRemoval Procedure Land Preparation Procedure6 J401 30 Pin Board-to-Flex Connector 4 J600 RF Connector5 J752 Audio Jack 8 M002 Simm Connector 7 J400 80 Pin Board-to Flex Connector9 M105 Battery Contact 10 M2 2 Pin-Contact SW-all Key/Switch11 J753 Microphone Socket 13 D401 through D412 LED Domestic Orders Ordering Replacement Parts and KitsCustomer Service Replacement PartsTable A-1 Replacement KitsMid Rate Travel Chargers Bluetooth Accessories NNTN2344 NA Table A-3. Recommended Programming Equipment Recommended Test Equipment and ToolsRecommended Programming Equipment Table A-2. Recommended Test Equipment and ToolsTTY Table A-4. Recommended Software@68P80401P05@
Related manuals
Manual 222 pages 58.9 Kb