Grizzly G0695 owner manual Spindle Break-In, Step

Page 20

Spindle Break-In

It is essential to closely follow the proper break-in procedures to ensure trouble-free performance of your mill.

NOTICE

DO NOT leave the area while the break- in procedure is under way. You must be ready to stop the machine if any problem occurs.

NOTICE

Successfully complete the spindle break-in procedure to avoid rapid wear of spindle components when placed into operation.

-18-

To perform the spindle break-in procedure:

1.Turn the machine ON, then use the speed dial to adjust the spindle speed to approxi- mately 200 RPM.

2.Let the mill run at this speed for 20 minutes, then turn the spindle OFF and wait for it to stop.

3.Use the spindle direction switch on the con- trol panel to reverse the spindle direction, then turn the mill ON and let it run for another 20 minutes.

4.Set the spindle speed at approximately 1800 RPM, repeat Steps 2–3,then proceed to

Step 5.

5.Turn the mill OFF. The spindle break-in is now complete and the machine is ready for operation.

Model G0695 (Mfg. Since 9/10)

Image 20
Contents Model G0695 VS Milling Machine With RAM Head Page Table of Contents Introduction Manual AccuracyContact Info Machine DescriptionIdentification Machine Data Sheet Table Info Safety Safety Instructions for MachineryWearing Proper APPAREL. Do not wear Hearing PROTECTION. Always wear hearSafety Instructions for Machinery Additional Safety Instructions For Mills Machine Care and MaintenanceGlossary of Terms 220V Single-Phase Operation Circuit RequirementsSetup Needed for SetupUnpacking Description QtyInventory Inventory Figure QtyCleanup Before cleaning, gather the followingSite Considerations Moving & Placing Mill Mounting to Shop FloorAssembly Using Machine MountsBolting to Concrete Floors To assemble your millTest Run Spindle Break-In StepControl Panel OperationsBasic Controls Table Controls Additional table travel controls Model G0695 Mfg. Since 9/10Downfeed Controls Operation Overview Table MovementLocks Limit StopsTo tilt the head Headstock TiltingTools Needed Qty Hex Bolt Headstock Turret Rotation To rotate the turretHeadstock Ram Movement To move the ram inward or outwardSetting Spindle Speed Setting Spindle SpeedCalculating Spindle Speed Cutting Speeds for High Speed Steel HSS Cutting ToolsChip Characteristics Loading/Unloading ToolingLoading Tooling Unloading ToolingAccessories G1075-52-PC. Clamping KitH8370-Power Feed for Mills G9299-10 Yuasa-Type Rotary TableH2689-R-8 Quick Change Collet Set G5641-1-2-3 Blocks G9815-Parallel Set H5556-Edge Finder SetG2861-Face Mill G4051-Carbide Insert for Face Mill G9765-9-PC. Ball End Mill SetG5758-Tilt x G5684-R-8 Vertical Collet RackG5649-5-C Spin Index G1054-Dividing Head-BS-1G5679-Steel Parallel Set Model G5679 Steel Parallel SetMaintenance Cleaning ProtectingSchedule LubricationOne-Shot Oiler Quill GearingVertical Bevel Gears Lubricant Frequency QtyTo tension the V-belt Belt TensioningLeadscrews Motor & Electrical ServiceTroubleshooting Operation Adjusting Gibs Disconnect Mill from Power Before Adjusting the GibsAdjusting Backlash Belt Replacement To replace the V-beltPage Wiring Wiring Safety InstructionsWiring Diagram Control panel wiring Electrical ComponentsBase, Column, & Knee Breakdown Base, Column, & Knee Parts List DescriptionHead Breakdown Head Parts List Motor & Ram Breakdown Motor & Ram Parts List Table Breakdown Table Parts List Label Placement Warranty Card CommentsGrizzly INDUSTRIAL, INC BOX BELLINGHAM, WAWarranty and Returns Warranty and ReturnsOrder Hours a DAY