Weider 831.159821 user manual M10 Nylon Locknut 70. Be sure the Cable Trap, On the Upright

Page 18

45.Wrap the Low Cable (47) around a 90mm Pulley (38). Attach the Pulley to the indicated bracket on the Right Base (1) with an M10 x 45mm Bolt (66) and an M10 Nylon Locknut (70).

46.Wrap the Low Cable (47) around a 90mm Pulley

(38).Attach the Pulley and a Cable Trap (91) to the lower set of holes in the indicated “U”-Bracket

(85)with an M10 x 50mm Bolt (62) and an M10

Nylon

Locknut (70).

Be sure the Cable Trap is

turned

to hold the Cable in the groove of the

Pulley.

 

47.Wrap the Low Cable (47) around a 90mm Pulley (38). Attach the Pulley and a Cable Trap (91) to the side of the Right Upright (6) with an M10 x 95mm Bolt (98), an M10 Washer (75), and an

M10 Nylon Locknut (70). Be sure the Cable Trap

is turned to hold the Cable in the groove of the Pulley.

48.Wrap the Low Cable (47) around a 90mm Pulley (38). Attach the Pulley and a pair of Pulley Covers (92) to the Right Upright (6) with an M10 x 100mm Bolt (84), two M10 Washers (75), and

an M10

Nylon Locknut (70).

Be sure the small

tabs on the

Pulley Covers are on the side

 

shown, and the Cable is between the Pulley

 

and the

rod

on the Upright.

 

45

 

 

 

 

 

38

 

 

 

47

 

 

70

 

 

 

1

66

 

46

 

 

 

 

70

 

85

 

 

 

 

91

 

62

 

38

 

47

 

 

 

47

 

 

 

98

47

 

 

 

 

 

 

91

 

 

 

38

 

 

 

6

 

 

 

 

75

70

 

 

 

48

Small

 

 

 

 

 

 

Tabs

 

 

 

75

 

 

84

 

 

 

 

92

 

 

 

38

75

 

47

92

70

 

 

6

 

18

Image 18
Contents Serial Number Decal under seat SEARS, Roebuck and CO. Hoffman ESTATES, ILTable of Contents Important Precautions Using the weight system Before YOU BeginLeft Side Assembly requires two people AssemblyFrame Assembly Make Things Easier for YourselfSide shown Do not tighten the M10 Nylon Locknuts 70 yet Nylon LocknutSide is on top LargeDo not tighten the M10 Nylon Locknuts Yet With two M10 x 85mm Bolts 60, two M10Attach the Right Seat Frame 5 to the Right 65mm Bolts 63, four M10 Washers 75, Two M10 Nylon LocknutsShown Not tighten the Locknuts yetARM Assembly Butterfly Frame must be able to pivot easilyRepeat this step with the Left Butterfly Arm Butterfly Arm Frame must be able to pivot easilyAn M10 Nylon Locknut Cable AssemblyLocate the High Cable 45. Route the Cable up Groove of the PulleyAn M8 Nylon Locknut IngLocate the Leg Press Cable 95.Attach M8 Nylon Locknut Locate the Butterfly CablePage Locate the Leg Lever Cable Attach a 90mm Pulley 38 inside the Right LegIng Locate the Low Cable 47. Route the small ball LocknutPulley Wrap the Low Cable 47 around a 90mm Pulley M10 Nylon Locknut 70. Be sure the Cable Trap Is turned to hold the Cable in the groove of the PulleyOn the Upright Seat Assembly Frame 9. Attach the tether on the Pins to Screw 68. Do not fully tighten the ScrewChanging the Weight Setting AdjustmentsAttaching the Accessories to a Pulley Station Converting the Butterfly ArmsPulley move smoothly Adjusting the LEG Press PlateTightening the Cables Move smoothlyWeight Resistance Chart Weight High Press LEG Butter LOW Pulley ARM FLY ARM LeverLbs Left Top Cable Diagrams Low CableCable ID Chart Leg Press Cable46 47 3/7 96 95 1/2 95 148 1/4 47 276 3/4 45 116 3/4 Exercise Guidelines Muscle Chart Cooling DownStaying Motivated If parts become worn and need to Full 90 DAY WarrantyModel No SEARS, Roebuck and CO., Hoffman ESTATES, ILCheck to see if it has been pre-assembled Part Identification CHART-Model No Page Save this Part LIST/EXPLODED Drawing for Future Reference Part LIST-Model No Qty Description Key No. QtyDRAWING-Model No R0403A