American Dryer Corp AD-310 Phase 7 installation manual

Page 25

a.Outside Ductwork Protection

1)To protect the outside end of horizontal ductwork from the weather, a 90º elbow bent downward should be installed where the exhaust exits the building. If the exhaust ductwork travels vertically up through the roof, it should be protected from the weather by using a 180º turn to point the opening downward. In either case, allow at least twice the diameter of the duct between the duct opening and nearest obstruction.

IMPORTANT: DO NOT use screens, louvers, or caps on the outside opening of the exhaust ductwork.

NOTE: Exhaust back pressure measured by a manometer at the dryer exhaust duct area must not exceed 0.3 inches (0.74 mb) of water column (W.C.).

NOTE: When the exhaust ductwork passes through a wall, ceiling, or roof made of combustible materials, the opening must be 2-inches (5.08 cm) larger than the duct (all the way around). The duct must be centered within this opening.

21

Image 25
Contents AD-310 Phase Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Burner and Basket TUMBLER/LINT Chamber Manual Reset Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications GAS and Steam SPECIFICATIONS/DIMENSIONS Component IdentificationDimensions and Component Location NON-TILT Steam Model Reassembly of Dryer Installation ProceduresPage Lift the basket tumbler section onto the base Page Reassembly Instructions For Non-Tilt Steam Dryers Location Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Compressed AIR Supply System Page Page Electrical Requirements Electrical InformationGas Non-Tilt Steam Non-Tilt Page GAS Information Type of GAS Page Water Supply Connection for Optional Sprinkler System Steam Information Operating Steam PressurePage Compressed Air Supply Air Pressure Page Steam Damper Air Piston Flow Control Operation Adjustment Preoperational Tests Natural Gas Inches 8.7 mb water column Liquid Propane L.P Basket Coating Preparation for OPERATION/START-UPShut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceSuggested Cleaning Schedule Monthly Lubrication AdjustmentsBasket Tumbler Drive System Component System DescriptionsBasket Tumbler Drive System Basket Tumbler Safety DevicesAIR Blower Drive System Page Steam Damper Actuator System P O R T a N T Phase 7 Steam Models only Data Label Data Label InformationSerial Number Procedure for Functional Check Replacement Components Page Diagnostic L.E.D. Display Fault Messages Phase 7 OPL System DiagnosticsPage O Board Input and Output L.E.D. Indicators Inputs RED Outputs Green RHE PGR1 Green L.E.D OCL5 Green L.E.D No Display TroubleshootingDrive motor is not operating does not start Impellor fan motor is not operating does not start Page Page Dryer operates but is taking too long to dry Excessive noise and vibration Tilt to unload Optional Sprinkler Circuit Components Optional Sprinkler System ComponentsSprinkler and Main Power Connections Sprinkler Option Temperature Controller Settings Page ADC 01/04/00-20 05/07/01-20
Related manuals
Manual 116 pages 19.79 Kb