American Dryer Corp AD-310 Phase 7 installation manual

Page 61

2.For Direct Spark Ignition (DSI) System Models Manufactured With ADC Module Part No. 880815

a. Upon completing installation of the replacement DSI module, reestablish power to the dryer.

b. Starting the drying cycle.

c. The ignition DSI module’s light emitting diode (L.E.D.) indicator will light “red” for up to approximately 1.5-seconds (prepurge time).

d. The module’s indicator light will then turn “green.” The gas valve will be energized and the ignitor probe will spark for approximately 8-seconds. The burner flame should now be established.

e. With the burner flame on, remove the flame sensor wire from the FS terminal of the DSI module.

f. The burner flame must shut off and the ignition module must lockout with the DSI module’s indicator light “red.”

g. Stop the drying cycle, with the flame sensor wire still removed, restart the drying cycle.

h.The ignition module must proceed through the prepurge, with the indicator light “red,” the ignition trial time of approximately 8-seconds, with the indicator light “green,” and then proceed to lockout with the indicator light “red.”

i.Functional check of the DSI module is complete.

1)Replace the flame sensor wire from the FS terminal to the DSI module.

57

Image 61
Contents AD-310 Phase Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Burner and Basket TUMBLER/LINT Chamber Manual Reset Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications GAS and Steam SPECIFICATIONS/DIMENSIONS Component IdentificationDimensions and Component Location NON-TILT Steam Model Reassembly of Dryer Installation ProceduresPage Lift the basket tumbler section onto the base Page Reassembly Instructions For Non-Tilt Steam Dryers Location Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Compressed AIR Supply System Page Page Electrical Requirements Electrical InformationGas Non-Tilt Steam Non-Tilt Page GAS Information Type of GAS Page Water Supply Connection for Optional Sprinkler System Steam Information Operating Steam PressurePage Compressed Air Supply Air Pressure Page Steam Damper Air Piston Flow Control Operation Adjustment Preoperational Tests Natural Gas Inches 8.7 mb water column Liquid Propane L.P Basket Coating Preparation for OPERATION/START-UPShut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceSuggested Cleaning Schedule Monthly Lubrication AdjustmentsBasket Tumbler Drive System Component System DescriptionsBasket Tumbler Drive System Basket Tumbler Safety DevicesAIR Blower Drive System Page Steam Damper Actuator System P O R T a N T Phase 7 Steam Models only Data Label Data Label InformationSerial Number Procedure for Functional Check Replacement Components Page Diagnostic L.E.D. Display Fault Messages Phase 7 OPL System DiagnosticsPage O Board Input and Output L.E.D. Indicators Inputs RED Outputs Green RHE PGR1 Green L.E.D OCL5 Green L.E.D No Display TroubleshootingDrive motor is not operating does not start Impellor fan motor is not operating does not start Page Page Dryer operates but is taking too long to dry Excessive noise and vibration Tilt to unload Optional Sprinkler Circuit Components Optional Sprinkler System ComponentsSprinkler and Main Power Connections Sprinkler Option Temperature Controller Settings Page ADC 01/04/00-20 05/07/01-20
Related manuals
Manual 116 pages 19.79 Kb