American Dryer Corp AD-310 Phase 7 installation manual Sprinkler and Main Power Connections

Page 78

SPRINKLER AND MAIN POWER CONNECTIONS

There are two (2) individual power connections to the dryer that includes the sprinkler system option.

1.Main dryer power (3-phase [3ø]).

2.Dedicated sprinkler system circuit power (single-phase [1ø]).

Both of these connections are at the voltage rating of the dryer and can be installed in the front right base electrical enclosure. The larger connection is for main electrical power and the smaller connections, located to the right of the larger connection is for the dedicated sprinkler system circuit power.

Refer to the dryer nameplate for voltage rating information.

SPRINKLER THEORY OF OPERATION

1.Power sprinkler system circuit.

2.“TURN TO RELEASE” ALL “EMERGENCY STOP” (E-Stop) buttons.

3.Run dryer.

If the temperature of the basket (tumbler) should rise above the sprinkler controller’s preset value the sprinkler system will activate and the following will occur:

An “AUTOMATIC ‘EMERGENCY STOP’” (E-Stop) will stop the dryer.

The alarm horn will sound.

The amber sprinkler system reset button will light.

The sprinkler system will spray water into the basket (tumbler).

The water will flow and the alarm horn will sound until;

The temperature of the basket (tumbler) falls below sprinkler controller’s preset value and the sprinkler system reset button is pressed.

NOTE: THE SPRINKLER SYSTEM DOES NOT AUTOMATICALLY RESET.

74

Image 78
Contents AD-310 Phase Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Burner and Basket TUMBLER/LINT Chamber Manual Reset Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/DIMENSIONS Component Identification Specifications GAS and SteamDimensions and Component Location NON-TILT Steam Model Installation Procedures Reassembly of DryerPage Lift the basket tumbler section onto the base Page Reassembly Instructions For Non-Tilt Steam Dryers Location Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Compressed AIR Supply System Page Page Electrical Information Electrical RequirementsGas Non-Tilt Steam Non-Tilt Page GAS Information Type of GAS Page Water Supply Connection for Optional Sprinkler System Operating Steam Pressure Steam InformationPage Compressed Air Supply Air Pressure Page Steam Damper Air Piston Flow Control Operation Adjustment Preoperational Tests Natural Gas Inches 8.7 mb water column Liquid Propane L.P Preparation for OPERATION/START-UP Basket CoatingShut Down Instructions SERVICE/PARTS Information ServiceParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningSuggested Cleaning Schedule Monthly Adjustments LubricationComponent System Descriptions Basket Tumbler Drive SystemBasket Tumbler Drive System Safety Devices Basket TumblerAIR Blower Drive System Page Steam Damper Actuator System P O R T a N T Phase 7 Steam Models only Data Label Information Data LabelSerial Number Procedure for Functional Check Replacement Components Page Phase 7 OPL System Diagnostics Diagnostic L.E.D. Display Fault MessagesPage O Board Input and Output L.E.D. Indicators Inputs RED Outputs Green RHE PGR1 Green L.E.D OCL5 Green L.E.D Troubleshooting No DisplayDrive motor is not operating does not start Impellor fan motor is not operating does not start Page Page Dryer operates but is taking too long to dry Excessive noise and vibration Tilt to unload Optional Sprinkler System Components Optional Sprinkler Circuit ComponentsSprinkler and Main Power Connections Sprinkler Option Temperature Controller Settings Page ADC 01/04/00-20 05/07/01-20
Related manuals
Manual 116 pages 19.79 Kb