American Dryer Corp AD-310 Phase 7 Water Supply Connection for Optional Sprinkler System

Page 36

Consistent gas pressure is essential at ALL gas connections. It is recommended that a 2-inch (5.08 cm) pipe gas loop be installed in the supply line servicing a bank of dryers. An in-line pressure regulator must be installed in the gas supply line (header) if the (natural) gas pressure exceeds 12.0 inches (29.9 mb) of water column (W.C.) pressure.

IMPORTANT: A water column pressure of 3.5 inches (8.7 mb) for natural gas and 10.5 inches (26.1 mb) for liquid propane (L.P.) dryers is required at the gas valve pressure tap of each dryer for proper and safe operation.

A 1/8-inch N.P.T. plugged tap, accessible for a test gauge connection, must be installed in the main gas supply line immediately upstream of each dryer.

IMPORTANT: Pipe joint compounds that resist the action of natural and L.P. gases must be used.

IMPORTANT: Test ALL connections for leaks by brushing on a soapy water solution (liquid detergent works well).

WARNING: NEVER TEST FOR GAS LEAKS WITH A FLAME!!!

ALL components/materials must conform to National Fuel Gas Code Specifications ANSI Z223.1-LATEST EDITION, or in Canada, CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (L.P. Gas) or LATEST EDITION (for General Installation and Gas Plumbing), as well as local codes and ordinances and must be done by a qualified professional. It is important that gas pressure regulators meet applicable pressure requirements, and that gas meters be rated for the total amount of ALL the appliance BTUs being supplied

IMPORTANT: The dryer and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.5 kPa).

NOTE: The dryer must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psig (3.5 kPa).

H. WATER SUPPLY CONNECTION FOR OPTIONAL SPRINKLER SYSTEM

If the optional sprinkler system was purchased with the dryer, connect a 40-70 psig (276-483 kPa) supply of water into the 1-inch F.P.T. sprinkler shutoff valve, which is located on top of the dryer on the left hand side.

32

Image 36
Contents AD-310 Phase Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Burner and Basket TUMBLER/LINT Chamber Manual Reset Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/DIMENSIONS Component Identification Specifications GAS and SteamDimensions and Component Location NON-TILT Steam Model Installation Procedures Reassembly of DryerPage Lift the basket tumbler section onto the base Page Reassembly Instructions For Non-Tilt Steam Dryers Location Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Compressed AIR Supply System Page Page Electrical Information Electrical RequirementsGas Non-Tilt Steam Non-Tilt Page GAS Information Type of GAS Page Water Supply Connection for Optional Sprinkler System Operating Steam Pressure Steam InformationPage Compressed Air Supply Air Pressure Page Steam Damper Air Piston Flow Control Operation Adjustment Preoperational Tests Natural Gas Inches 8.7 mb water column Liquid Propane L.P Preparation for OPERATION/START-UP Basket CoatingShut Down Instructions SERVICE/PARTS Information ServiceParts Warranty Information Returning Warranty CardsWarranty Returning Warranty PartsPage Routine Maintenance CleaningSuggested Cleaning Schedule Monthly Adjustments LubricationComponent System Descriptions Basket Tumbler Drive SystemBasket Tumbler Drive System Safety Devices Basket TumblerAIR Blower Drive System Page Steam Damper Actuator System P O R T a N T Phase 7 Steam Models only Data Label Information Data LabelSerial Number Procedure for Functional Check Replacement Components Page Phase 7 OPL System Diagnostics Diagnostic L.E.D. Display Fault MessagesPage O Board Input and Output L.E.D. Indicators Inputs RED Outputs Green RHE PGR1 Green L.E.D OCL5 Green L.E.D Troubleshooting No DisplayDrive motor is not operating does not start Impellor fan motor is not operating does not start Page Page Dryer operates but is taking too long to dry Excessive noise and vibration Tilt to unload Optional Sprinkler System Components Optional Sprinkler Circuit ComponentsSprinkler and Main Power Connections Sprinkler Option Temperature Controller Settings Page ADC 01/04/00-20 05/07/01-20
Related manuals
Manual 116 pages 19.79 Kb