American Dryer Corp AD-310 Phase 7 installation manual Table of Contents

Page 5

Table of Contents

SECTION I

 

IMPORTANT INFORMATION

3

A. Receiving and Handling

3

B.

Safety Precautions

4

SECTION II

 

SPECIFICATIONS/DIMENSIONS AND COMPONENT IDENTIFICATION6

A. Specifications (Gas and Steam)

6

B. Dimensions and Component Location

7

SECTION III

 

INSTALLATION PROCEDURES

9

A. Reassembly Of Dryer

9

B. Location Requirements

14

C. FreshAir Supply Requirements

15

D. Exhaust Requirements

16

E. CompressedAir Supply System

22

F.

Electrical Information

25

G.. Gas Information

29

H. Water Supply Connection For Optional Sprinkler System

32

I.

Steam Information

33

J.

Preoperational Tests

38

K. Preparation For Operation/Start-Up

40

L.

Shut Down Instructions

41

SECTION IV

 

SERVICE/PARTS INFORMATION

42

A. Service

42

B. Parts

42

SECTION V

 

WARRANTY INFORMATION

43

A.

Returning Warranty Card(s)

43

B.

Warranty

43

C.

Returning Warranty Part(s)

43

Image 5
Contents AD-310 Phase Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Burner and Basket TUMBLER/LINT Chamber Manual Reset Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications GAS and Steam SPECIFICATIONS/DIMENSIONS Component IdentificationDimensions and Component Location NON-TILT Steam Model Reassembly of Dryer Installation ProceduresPage Lift the basket tumbler section onto the base Page Reassembly Instructions For Non-Tilt Steam Dryers Location Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Compressed AIR Supply System Page Page Electrical Requirements Electrical InformationGas Non-Tilt Steam Non-Tilt Page GAS Information Type of GAS Page Water Supply Connection for Optional Sprinkler System Steam Information Operating Steam PressurePage Compressed Air Supply Air Pressure Page Steam Damper Air Piston Flow Control Operation Adjustment Preoperational Tests Natural Gas Inches 8.7 mb water column Liquid Propane L.P Basket Coating Preparation for OPERATION/START-UPShut Down Instructions Parts SERVICE/PARTS InformationService Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Suggested Cleaning Schedule Routine MaintenanceCleaning Monthly Lubrication AdjustmentsBasket Tumbler Drive System Component System DescriptionsBasket Tumbler Drive System AIR Blower Drive System Safety DevicesBasket Tumbler Page Steam Damper Actuator System P O R T a N T Phase 7 Steam Models only Data Label Data Label InformationSerial Number Procedure for Functional Check Replacement Components Page Diagnostic L.E.D. Display Fault Messages Phase 7 OPL System DiagnosticsPage O Board Input and Output L.E.D. Indicators Inputs RED Outputs Green RHE PGR1 Green L.E.D OCL5 Green L.E.D No Display TroubleshootingDrive motor is not operating does not start Impellor fan motor is not operating does not start Page Page Dryer operates but is taking too long to dry Excessive noise and vibration Tilt to unload Optional Sprinkler Circuit Components Optional Sprinkler System ComponentsSprinkler and Main Power Connections Sprinkler Option Temperature Controller Settings Page ADC 01/04/00-20 05/07/01-20
Related manuals
Manual 116 pages 19.79 Kb