F.ELECTRICAL INFORMATION

1.Electrical Requirements

It is your responsibility to have ALL electrical connections made by a properly licensed and competent electrician to assure that the electrical installation is adequate and conforms to local and state regulations or codes. In the absence of such codes, ALL electrical connections, materials, and workmanship must conform to the applicable requirements of the National Electrical Code ANSI/NFPA NO. 70-LATEST EDITION or in Canada, the Canadian Electrical Codes Parts 1 and 2 CSA C22.1-1990 or LATEST EDITION.

IMPORTANT: Failure to comply with these codes or ordinances, and/or the requirements stipulated in this manual can result in personal injury or component failure.

NOTE: Component failure due to improper installation VOIDS THE WARRANTY.

Each dryer should be connected to an independently protected branch circuit. The dryer must be connected with copper wire only. DO NOT use aluminum wire, which could cause a fire hazard. The copper conductor wire/cable must be of proper ampacity and insulation in accordance with electric codes for making ALL service connects.

NOTE: The use of aluminum wire will VOID THE WARRANTY.

25

Image 29
Contents AD-310 Phase Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Burner and Basket TUMBLER/LINT Chamber Manual Reset Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications GAS and Steam SPECIFICATIONS/DIMENSIONS Component IdentificationDimensions and Component Location NON-TILT Steam Model Reassembly of Dryer Installation ProceduresPage Lift the basket tumbler section onto the base Page Reassembly Instructions For Non-Tilt Steam Dryers Location Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Compressed AIR Supply System Page Page Electrical Requirements Electrical InformationGas Non-Tilt Steam Non-Tilt Page GAS Information Type of GAS Page Water Supply Connection for Optional Sprinkler System Steam Information Operating Steam PressurePage Compressed Air Supply Air Pressure Page Steam Damper Air Piston Flow Control Operation Adjustment Preoperational Tests Natural Gas Inches 8.7 mb water column Liquid Propane L.P Basket Coating Preparation for OPERATION/START-UPShut Down Instructions Parts SERVICE/PARTS InformationService Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Suggested Cleaning Schedule Routine MaintenanceCleaning Monthly Lubrication AdjustmentsBasket Tumbler Drive System Component System DescriptionsBasket Tumbler Drive System AIR Blower Drive System Safety DevicesBasket Tumbler Page Steam Damper Actuator System P O R T a N T Phase 7 Steam Models only Data Label Data Label InformationSerial Number Procedure for Functional Check Replacement Components Page Diagnostic L.E.D. Display Fault Messages Phase 7 OPL System DiagnosticsPage O Board Input and Output L.E.D. Indicators Inputs RED Outputs Green RHE PGR1 Green L.E.D OCL5 Green L.E.D No Display TroubleshootingDrive motor is not operating does not start Impellor fan motor is not operating does not start Page Page Dryer operates but is taking too long to dry Excessive noise and vibration Tilt to unload Optional Sprinkler Circuit Components Optional Sprinkler System ComponentsSprinkler and Main Power Connections Sprinkler Option Temperature Controller Settings Page ADC 01/04/00-20 05/07/01-20