American Dryer Corp AD-310 Phase 7 Natural Gas Inches 8.7 mb water column Liquid Propane L.P

Page 43

NOTE: Dryer can be stopped at any time by opening the main door or by pressing the “CLEAR/ STOP” key. To restart the dryer, press the “ENTER/START” key or a preprogrammed cycle key (i.e., “E”).

NOTE: Pressing keyboard (touch pad) key “A,” “B,” “C,” “D,” and “F” will also start the dryer. The six (6) preprogrammed drying cycles (“A” thru “F”) have been stored in the Microprocessor controller’s (computer’s) memory. Refer to the Programming Manual supplied with the dryer for these preprogrammed cycles.

10.Check to insure that the basket (tumbler) starts in the clockwise (CW) direction. Additionally, check the direction of the blower motor to insure that it rotates in the counterclockwise (CCW) direction as viewed from the left side of the dryer. If it does, the phasing is correct. If the phasing is incorrect, reverse two (2) of the leads at L1, L2, or L3 of the power supply connections made to the dryer.

IMPORTANT: Dryer blower motor and impellor/fan shaft as viewed from the left side of the dryer must turn in the counterclockwise (CCW) direction, otherwise the dryer efficiency will be drastically reduced, and premature component failure can result.

11.Heat Circuit Operational Test a. Gas Models

1)When the dryer is first started (during initial start-up), the burners have a tendency not to ignite on the first attempt. This is because the gas supply piping is filled with air, so the dryer may have to be stopped and restarted several times for this air to be purged from the lines.

2)The dryer has two (2) burner boxes and each burner has its own Direct Spark Ignition (DSI) module and Spark Ignition/Flame-Probe Assembly. If ignition is not established after first attempt, the heat circuit DSI module will lockout until it is manually reset. To reset the DSI system, open and close the loading doors and restart the dryer (press “ENTER/START” key).

If one burner lights and the other does not, then the system will shut both burners off and the burner fault code will be displayed showing which of the two (2) burner failed to ignite.

NOTE: During the purging period, verify that ALL gas shutoff valves are open.

3)Once ignition is established, a gas pressure test should be taken at each gas valve pressure tap of the dryer to assure that the water column (W.C.) pressure is correct and consistent.

NOTE: Water column pressure requirements (measured at both gas valve pressure taps)...

Natural Gas ---------------

3.5 inches (8.7 mb) water column.

Liquid Propane (L.P.) -----

10.5 (26.1 mb) inches water column.

IMPORTANT: There is no regular provided in an L.P. dryer. The water column pressure must be regulated at the source (L.P. tank), or an external regulator must be added to each dryer.

b.Steam Models

1)Check to insure that the steam damper is functioning properly.

39

Image 43
Contents AD-310 Phase Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Burner and Basket TUMBLER/LINT Chamber Manual Reset Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications GAS and Steam SPECIFICATIONS/DIMENSIONS Component IdentificationDimensions and Component Location NON-TILT Steam Model Reassembly of Dryer Installation ProceduresPage Lift the basket tumbler section onto the base Page Reassembly Instructions For Non-Tilt Steam Dryers Location Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Compressed AIR Supply System Page Page Electrical Requirements Electrical InformationGas Non-Tilt Steam Non-Tilt Page GAS Information Type of GAS Page Water Supply Connection for Optional Sprinkler System Steam Information Operating Steam PressurePage Compressed Air Supply Air Pressure Page Steam Damper Air Piston Flow Control Operation Adjustment Preoperational Tests Natural Gas Inches 8.7 mb water column Liquid Propane L.P Basket Coating Preparation for OPERATION/START-UPShut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Cleaning Routine MaintenanceSuggested Cleaning Schedule Monthly Lubrication AdjustmentsBasket Tumbler Drive System Component System DescriptionsBasket Tumbler Drive System Basket Tumbler Safety DevicesAIR Blower Drive System Page Steam Damper Actuator System P O R T a N T Phase 7 Steam Models only Data Label Data Label InformationSerial Number Procedure for Functional Check Replacement Components Page Diagnostic L.E.D. Display Fault Messages Phase 7 OPL System DiagnosticsPage O Board Input and Output L.E.D. Indicators Inputs RED Outputs Green RHE PGR1 Green L.E.D OCL5 Green L.E.D No Display TroubleshootingDrive motor is not operating does not start Impellor fan motor is not operating does not start Page Page Dryer operates but is taking too long to dry Excessive noise and vibration Tilt to unload Optional Sprinkler Circuit Components Optional Sprinkler System ComponentsSprinkler and Main Power Connections Sprinkler Option Temperature Controller Settings Page ADC 01/04/00-20 05/07/01-20
Related manuals
Manual 116 pages 19.79 Kb