American Dryer Corp AD-310 Phase 7 Section Burner and Basket TUMBLER/LINT Chamber Manual Reset

Page 6

SECTION VI

 

ROUTINE MAINTENANCE

45

A. Cleaning

45

B. Adjustments

47

C. Lubrication

47

SECTION VII

 

COMPONENT SYSTEM DESCRIPTIONS

48

A. Basket (Tumbler) Drive System

48

B. Basket (Tumbler)

49

C. Air Blower Drive System

49

D. Safety Devices

49

E. Steam Damper Actuator System

51

SECTION VIII

 

BURNER AND BASKET (TUMBLER)/LINT CHAMBER MANUAL RESET

HI-LIMIT INSTRUCTIONS

52

Gas Models Only

52

Steam Models Only

53

SECTION IX

 

DATA LABEL INFORMATION

54

A. Data Label

54

SECTION X

 

PROCEDURE FOR FUNCTIONAL CHECK OF REPLACEMENT

 

COMPONENTS

56

SECTION XI

 

PHASE 7 OPL SYSTEM DIAGNOSTICS

58

A. Diagnostic (L.E.D. Display) Fault Messages

58

B. I/O Board Input and Output L.E.D. Indicators

60

SECTION XII

 

TROUBLESHOOTING

65

SECTION XIII

 

OPTIONAL SPRINKLER SYSTEM COMPONENTS

73

Optional Sprinkler Circuit Components

73

Sprinkler Option Temperature Controller Settings

75

Image 6
Contents AD-310 Phase Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Burner and Basket TUMBLER/LINT Chamber Manual Reset Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/DIMENSIONS Component Identification Specifications GAS and SteamDimensions and Component Location NON-TILT Steam Model Installation Procedures Reassembly of DryerPage Lift the basket tumbler section onto the base Page Reassembly Instructions For Non-Tilt Steam Dryers Location Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Compressed AIR Supply System Page Page Electrical Information Electrical RequirementsGas Non-Tilt Steam Non-Tilt Page GAS Information Type of GAS Page Water Supply Connection for Optional Sprinkler System Operating Steam Pressure Steam InformationPage Compressed Air Supply Air Pressure Page Steam Damper Air Piston Flow Control Operation Adjustment Preoperational Tests Natural Gas Inches 8.7 mb water column Liquid Propane L.P Preparation for OPERATION/START-UP Basket CoatingShut Down Instructions SERVICE/PARTS Information ServiceParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningSuggested Cleaning Schedule Monthly Adjustments LubricationComponent System Descriptions Basket Tumbler Drive SystemBasket Tumbler Drive System Safety Devices Basket TumblerAIR Blower Drive System Page Steam Damper Actuator System P O R T a N T Phase 7 Steam Models only Data Label Information Data LabelSerial Number Procedure for Functional Check Replacement Components Page Phase 7 OPL System Diagnostics Diagnostic L.E.D. Display Fault MessagesPage O Board Input and Output L.E.D. Indicators Inputs RED Outputs Green RHE PGR1 Green L.E.D OCL5 Green L.E.D Troubleshooting No DisplayDrive motor is not operating does not start Impellor fan motor is not operating does not start Page Page Dryer operates but is taking too long to dry Excessive noise and vibration Tilt to unload Optional Sprinkler System Components Optional Sprinkler Circuit ComponentsSprinkler and Main Power Connections Sprinkler Option Temperature Controller Settings Page ADC 01/04/00-20 05/07/01-20
Related manuals
Manual 116 pages 19.79 Kb