American Dryer Corp AD-310 Phase 7 installation manual Gas Non-Tilt

Page 30

2.Electrical Service Specifications

310 (Gas) Non-Tilt

15 HP Blower/5 HP Drive Motor

ELECTRICAL SERVICE SPECIFICATIONS (PER DRYER)

IMPORTANT: 208 VAC and 230 VAC ARE NOT THE SAME. When ordering, specify exact voltage.

NOTES:

A.

Fuse ratings are dual element, time delay, current limiting, class RK1 or RK5 ONLY.

 

B.

Circuit breakers are thermal/magnetic (industrial) motor curve type ONLY. For others,

 

calculate/ verify correct breaker size according to appliance amp draw rating and type of

 

 

breaker used.

 

C.

Circuit breakers for 3-phase (3ø) dryers must be 3-pole type.

SERVICE

PHASE

WIRE

APPROX.

FUSING

CIRCUIT

Dual Element

VOLTAGE

SERVICE

AMP DRAW

BREAKER

 

Time Delay

 

 

 

 

 

208

3/4

57

80

90

 

 

 

 

 

 

230

3

53

80

90

380

3/4

31

50

60

416

3/4

29

50

60

 

 

 

 

 

 

460/480

3/4

30

50

60

 

 

 

 

 

 

IMPORTANT: The dryer must be connected to the electric supply shown on the data label that is affixed to the right electrical control panel.

WARNING: 208 VAC and 230 VAC ARE NOT THE SAME. Any damage done to dryer components due to improper voltage connections will automatically VOID THE WARRANTY.

NOTE: ADC reserves the right to make any changes in specifications at any time without notice or obligation.

26

Image 30
Contents AD-310 Phase Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Burner and Basket TUMBLER/LINT Chamber Manual Reset Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/DIMENSIONS Component Identification Specifications GAS and SteamDimensions and Component Location NON-TILT Steam Model Installation Procedures Reassembly of DryerPage Lift the basket tumbler section onto the base Page Reassembly Instructions For Non-Tilt Steam Dryers Location Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Compressed AIR Supply System Page Page Electrical Information Electrical RequirementsGas Non-Tilt Steam Non-Tilt Page GAS Information Type of GAS Page Water Supply Connection for Optional Sprinkler System Operating Steam Pressure Steam InformationPage Compressed Air Supply Air Pressure Page Steam Damper Air Piston Flow Control Operation Adjustment Preoperational Tests Natural Gas Inches 8.7 mb water column Liquid Propane L.P Preparation for OPERATION/START-UP Basket CoatingShut Down Instructions SERVICE/PARTS Information ServiceParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningSuggested Cleaning Schedule Monthly Adjustments LubricationComponent System Descriptions Basket Tumbler Drive SystemBasket Tumbler Drive System Safety Devices Basket TumblerAIR Blower Drive System Page Steam Damper Actuator System P O R T a N T Phase 7 Steam Models only Data Label Information Data LabelSerial Number Procedure for Functional Check Replacement Components Page Phase 7 OPL System Diagnostics Diagnostic L.E.D. Display Fault MessagesPage O Board Input and Output L.E.D. Indicators Inputs RED Outputs Green RHE PGR1 Green L.E.D OCL5 Green L.E.D Troubleshooting No DisplayDrive motor is not operating does not start Impellor fan motor is not operating does not start Page Page Dryer operates but is taking too long to dry Excessive noise and vibration Tilt to unload Optional Sprinkler System Components Optional Sprinkler Circuit ComponentsSprinkler and Main Power Connections Sprinkler Option Temperature Controller Settings Page ADC 01/04/00-20 05/07/01-20
Related manuals
Manual 116 pages 19.79 Kb