INSTALLATION
PREMIUM FLUSH FRONT INSTALLATION
1)Unplug the power source.
2)Remove the glass door.
ECS Manual Control Switch Installation:
3)Remove the heat shield from the left side of the faceplate by undoing the 2 screws. See diagram 1.
Left Side
Heat Shield
Diagram 1
4)Unplug the CAT5 cable from the ECS manual switch included with the unit. See diagram 2.
5)Remove the 2 bolts, washers, phenolic spacers, split lock washers and nuts securing the manual control switch to separate the manual control switch keypad. See diagram 2.
Manual Control
Switch Keypad
Control Switch
Diagram 2 | Bolts | CAT5 Cable |
| Receptacle | |
|
|
6)Place the ECS manual control switch key pad on the outside of the opening in the faceplate and the control switch to the inside of the faceplate.
Align the holes and secure in place using the 2 bolts, washers, phenolic spacers, split lock washers and nuts. See diagram 3 for sequence. Diagram 4 shows ECS manual control switch mounted on faceplate.
Washer
Phenolic Spacer
Split Lock Washer
Nut
Diagram 3
ECS Manual Switch
Diagram 4
7)Run the thermodisc wires thru the hole in the heat shield.
Then place the grommet over the sleeve and tuck into the hole in the heat shield as shown in diagram 5.
Grommet
Diagram 5
16 | Regency IG35 Gas Inbuilt Fireplace |