Heat Controller HTS SERIES SPLIT SYSTEM, HSS manual This page left intentionally blank

Page 2

T h e Q u a l i t y L e a d e r i n C o n d i t i o n i n g A i r

R e s i d e n t i a l S p l i t - 6 0 H z R 2 2 & R 4 1 0 A

R e v. : 5 J u n e , 2 0 0 8

This page left intentionally blank

2

w w w. h e a t c o n t o l l e r. c o m

Image 2
Contents Split Products This page left intentionally blank Model Nomenclature for Indoor Split Series Safety SafetyGeneral Information Indoor Coil Selection HTS GeoMax Equipment SelectionGeneral GeoMax 2 HTS Air Handler Matches for ARI RatingsCFM Indoor Coil Selection For HSS R-22 UnitsAir Handler Selection Example Air Handler Installation InstallationRemoving Existing Condensing Unit Where Applicable Indoor Compressor Section LocationHTS/HSS Installation Piping Installation GROUND-LOOP Heat Pump ApplicationsFlushing the Earth Loop Low Water Temperature Cutout Setting CXM ControlGround-Loop Heat Pump Applications AntifreezeAntifreeze Percentages by Volume Approximate Fluid Volume U.S. gal. L per 100 of PipeFluid Volume gal liters per 100’ 30 meters Pipe Compressor section must be sealed to prevent entryWater Control Valve Water Quality StandardsExpansion Tank and Pump Flow RegulationWater Coil Low Temperature Limit Setting Water Well ConnectionsWater Quality Standards Erosion and CloggingLineset Diameters and Charge Information Refrigeration InstallationLine Set Installation Add-On Heat Pump Applications Evacuation and Charging the UnitRefrigeration Installation Evacuation Of The Lineset And Coil Charging The SystemDetermining Sub-Cooling Checking Superheat and Subcooling Determining SuperheatExample R-22 refrigerant Typical HWG Installation Indoor Compressor Section Hot Water GeneratorWater Tank Refill Water Tank PreparationHWG Water Piping Initial Start-UpHot Water Generator Module Refrigeration Installation HSS Series Electrical Data Electrical Line VoltageGeoMax 2 HTS Series Electrical Data Electrical Power Wiring Low Water Temperature Cutout Selection Electrical HWG WiringHWG Wiring Indoor Compressor Section Thermostat ConnectionsTwo-stage HTS Units Electrical Low Voltage WiringAccessory Connections Taco ValveThermostat Installation Two-Stage HTS PipingCXM Controls Air coil low temperature FP2 The FP2 thermistor temperature Safety Features CXM ControlWater coil low temperature FP1 The FP1 thermistor Diagnostic FeaturesPage Y1, Y2, O Stage 2 cooling CXM Control Start-up OperationVariable Speed PSC Air Handler Nominal resistance at various temperatures CXM Thermostat DetailsStarting Conditions Unit Starting and Operating ConditionsOperating Limits Unit OperationUnit and System Checkout Before Powering SYSTEM, please check the followingUnit Start-up Procedure Unit Start-Up Procedure Test Mode PinsR-22 HSS Compressor Section Coax Water Pressure Drop Water Temperature Change Through Heat ExchangerUnit Operating Conditions GPM 22 HSS Typical Unit Operating Pressures and Temperatures Preventive Maintenance Troubleshooting CXM Process Flow Chart Functional Troubleshooting Functional Troubleshooting Performance Troubleshooting Troubleshooting Form S i d e n t i a l S p l i t 6 0 H z R 2 2 & R 4 1 0 a 08/08