Heat Controller
HTS SERIES SPLIT SYSTEM, HSS
manual
08/08
Troubleshooting
Install
CXM Process Flow Chart
Electrical Power Wiring
Maintenance
Diagnostic Features
Accessory Connections
Test Mode Pins
Unit Start-up Procedure
Safety
Page 48
08/08
Page 47
Page 48
Image 48
Page 47
Page 48
Contents
Split Products
This page left intentionally blank
Model Nomenclature for Indoor Split Series
Safety
Safety
General Information
Equipment Selection
General
Indoor Coil Selection HTS GeoMax
GeoMax 2 HTS Air Handler Matches for ARI Ratings
CFM
Indoor Coil Selection For HSS R-22 Units
Air Handler Selection Example
Installation
Removing Existing Condensing Unit Where Applicable
Air Handler Installation
Indoor Compressor Section Location
HTS/HSS Installation
Piping Installation
GROUND-LOOP Heat Pump Applications
Low Water Temperature Cutout Setting CXM Control
Ground-Loop Heat Pump Applications
Flushing the Earth Loop
Antifreeze
Approximate Fluid Volume U.S. gal. L per 100 of Pipe
Fluid Volume gal liters per 100’ 30 meters Pipe
Antifreeze Percentages by Volume
Compressor section must be sealed to prevent entry
Water Quality Standards
Expansion Tank and Pump
Water Control Valve
Flow Regulation
Water Coil Low Temperature Limit Setting
Water Well Connections
Water Quality Standards
Erosion and Clogging
Refrigeration Installation
Line Set Installation
Lineset Diameters and Charge Information
Add-On Heat Pump Applications
Evacuation and Charging the Unit
Refrigeration Installation
Evacuation Of The Lineset And Coil
Charging The System
Checking Superheat and Subcooling Determining Superheat
Example R-22 refrigerant
Determining Sub-Cooling
Typical HWG Installation Indoor Compressor Section
Hot Water Generator
Water Tank Preparation
HWG Water Piping
Water Tank Refill
Initial Start-Up
Hot Water Generator Module Refrigeration Installation
Electrical Line Voltage
GeoMax 2 HTS Series Electrical Data
HSS Series Electrical Data
Electrical Power Wiring
Electrical HWG Wiring
HWG Wiring Indoor Compressor Section
Low Water Temperature Cutout Selection
Thermostat Connections
Electrical Low Voltage Wiring
Accessory Connections
Two-stage HTS Units
Taco Valve
Thermostat Installation
Two-Stage HTS Piping
CXM Controls
Safety Features CXM Control
Water coil low temperature FP1 The FP1 thermistor
Air coil low temperature FP2 The FP2 thermistor temperature
Diagnostic Features
Page
CXM Control Start-up Operation
Variable Speed PSC Air Handler
Y1, Y2, O Stage 2 cooling
Nominal resistance at various temperatures
CXM Thermostat Details
Unit Starting and Operating Conditions
Operating Limits
Starting Conditions
Unit Operation
Before Powering SYSTEM, please check the following
Unit Start-up Procedure
Unit and System Checkout
Unit Start-Up Procedure
Test Mode Pins
Water Temperature Change Through Heat Exchanger
Unit Operating Conditions
R-22 HSS Compressor Section Coax Water Pressure Drop
GPM
22 HSS Typical Unit Operating Pressures and Temperatures
Preventive Maintenance
Troubleshooting
CXM Process Flow Chart
Functional Troubleshooting
Functional Troubleshooting Performance Troubleshooting
Troubleshooting Form
S i d e n t i a l S p l i t 6 0 H z R 2 2 & R 4 1 0 a
08/08
Related pages
Top
Page
Image
Contents