Premier HV 15 Fitting Solution Tank Diagrams 5, 6, Operating Solution Tank, To fit Control Cable

Page 5

E

D

H

C

G 5

H

J

K

6

M

N

H

7

Fitting Solution Tank - DIAGRAMS 5, 6 and 7

1 Remove three plastic covers and screws at rear of chrome motor cover. Firmly anchor mounting block (G) in position using three screwsprovided.

2 Align slots in bracket (D) with inserts in side of machine handle. Using two screws provided lightly clamp bracket into position. Do not fully tighten bracket at this stage.

3 Locate lower tank mounting bracket over block (G) on chrome cover and secure by pushing retaining pin (B) through both sections until locked.

4 Locate upper bracket around machine handle shaft and secure by pushing retaining pin (A) through both sections until locked.

A5 Connect plastic tube (C) to feed point (F) on machine base.

To fit Control Cable

6 Screw connector (J) of control cable (H) onto tank plunger rod (K) and HAND tighten against fixed locknut (L) - DIAGRAM6.

7 Slide cable loop over left hand flow control lever (E) and locate in groove - DIAGRAM5.

8 Slide bush (M) on control cable (H) into slot in bracket (D) and tighten hand nut (N) to secure - DIAGRAM7.

9 With handle in the UPRIGHT position, lightly push bracket (D)

down until any free play in control cable (H) is eliminated. Firmly

Btighten bracket screws and cover screw heads with snap caps provided.

Do not apply excessive force when adjusting bracket for free play.

Note: If your machine does not have locating holes in side Of handle

For at rear of chrome motor cover to enable fixing of either the cable bracket (D) or tank mounting block (G) please ring 01242 243421 and specify the model name shown on the motor cover label and the serial number stamped on the serial plate locatedonthebase casting underneath the handle pivot.

Operating Solution Tank

1 Always fill solution tank in upright position.

2 The useful capacity of the tank for calculating dilution rates when mixing cleaning solution is 11 litres.

3 To operate, gently raise flow control lever (E) whilst machine is

Lrunning.

4 To empty:

a.Disconnect plastic tube (C).

b.Unscrew hand nut (N) and slide bush (M) on control cable (H) from slot in bracket (D).

c.Slide cable loop from flow control lever (E).

Dd. Remove retaining pins (A) and (B).

e. Unscrew cap, pour out cleaning solution then rinse.

5

Image 5
Contents Premiere Products Introduction Quality Control ProceduresApprovals Machine CareCables and Extension leads Before UseFor all HV Models Fitting/Removing AccessoriesTo fit Anti-splash Ring Diagrams 3 To fit Control Cable Fitting Solution Tank Diagrams 5, 6Operating Solution Tank Only fitted to certain High Performance Models Operation of overload switchOperation of PV.4 Series Servicing Cleaning MethodsTo Polish Floors To Burnish FloorsIf machine unbalanced in operation GuaranteeElectricity at Work Regulations HeaIth and Safety at Work ActEntretien des machines Le contrôle de qualitéHomologations Câbles et Rallonges Avant lutilisationAvertissement Pour tous les modèles HV Montage et démontage des accessoiresMontage du câble de commande Montage du réservoir a solutionFonctionnement du réservoir à solution Qui néquipe que certains modèles hautement performants Mode demploi des appareils de la Série PVFonctionnement de la protection contre les surcharges Entretien/réparations Méthodes de nettoyageLustrage des sols Polissage/encaustiquage des solsSila machine se déséquilibre pendant le fonctionnement GarantieSanté et Sécurité au Travail Qualitätskontrolle EinführungZulassungen MaschinenpflegeVor dem Gebrauch Warnung Die folgenden Maschinen müssen geerdet seinWichtiger Hinweis Kabel und VerlängerungskabelMontage des Anti-Spritzringes Bild 3 und An/Abbau von ZubehörteilenFür alle HV Modelle Anbau des Flüssigkeitskontrollkabels Anbau des Lösungs-tanks Bild 5, 6 undBedienung des Lösungtanks Dieser ist nicht in alle Maschinen eingebaut Bedienung der P.V.4-SerieBedienung des Überlastschalters Reinigungsmethoden Machine-Onderhoud ServicePolieren SprayreinigenDie Maschine beginnt zu springen Gesundheit und Sicherheit am Arbeitsplatz Introductie Kwaliteitscontrole -ProceduresGoedkeuringen Machine-onderhoudWaarschuwing Vóór gebruikBelangrijk Kabels en verlengsnoerenAntispatring plaatsen Figuur 3 en Accessoires plaatsen/verwijderenAlIe HV modellen Bedieningskabel plaatsen Vloeistoftank plaatsen Figuur 5, 6 enVloeistoftank bedienen Bediening van de overbelastings-schakelaar Bediening serie PV4Onderhoud ReinigingsmethodenBoenen van vloeren Poetsen van vloerenOngebalanceerde werking van de machine Gezondheid en veiligheid in de werkplaats Procedimìentos de control de calidad IntroducciónAprobaciones Cuidado del aparatoAdvertencia Antes de usarImportante Cables y extensionesColocación del Anillo Antisalpicaduras Cuadros 3 y Montaje/Desmontaje de los AccesoriosInstrucciones para todos los Modelos HV Montaje del Cable de Control Montaje del Depósito de la SoluciónFuncionamiento del depósito de la Solución Instalado en ciertos modelos de Alto Rendimiento Funcionamiento de la Serie PV4Servicio de Entretenimiento Métodos de limpiezaAbrillantado de suelos Pulido de suelosSi la máquina está desequilibrada cuando está en marcha GarantíaSalud y Seguridad en el Trabajo Métodos de controle da qualidade IntroduçãoAprovações Cuidados com os AparelhosAntes de Utilizar o Aparelho Atenção Os aparelhos seguintes devem ter ligação à terraAdvertência Cabos eléctricos e Fios de extensãoPara todos os Modelos HV Instalação e Remoção de AccessóriosInstalação do Aro Anti-Respingo Diagramas 3 e Colocação do Cordão de Controle Funcionamento do Depósito de Solução para LimpezaSomente instalado em certos modelos de alta capacidade Funcionamento da Série PV4Funcionamento do disjuntor de sobrecarga Serviço de Manutenção Métodos de LimpezaPolimento de soalhos Brunimento do SoalhoGarantia Saúde e Segurança no Trabalho Procedimenti di controllo qualità IntroduzioneOmologazioni Manutenzione dellapparecchioCavi e prolunghe Precauzioni dimpiegoAvvertenza Montaggio dellanello paraspruzzi- e Montaggio/Smontaggio degli AccessoriPer tutti i modelli HV Montaggio del cavo di comando Montaggio del serbatoio , 6 eFunzionamento del serbatoio Montato soltanto su alcuni modelli ad alto rendimento Funzionamento della serie PV4Manutenzione degli apparecchi Metodi per la pulizia dei pavimentiLucidatura di pavimenti Brunitura di pavimentiGaranzia Igiene e sicurezza sul lavoro Page Page Premiere Products

HV 13, HV 15, HV 17 specifications

The Premier HV series comprises several high-performance, energy-efficient machines designed to meet the demands of modern industries. This range includes the HV 15, HV 13, and HV 17 models, each tailored for specific applications but sharing a commitment to advanced technology and robust performance.

The Premier HV 15 model stands out with its optimized energy consumption, achieving superior efficiency without compromising on power output. Its innovative design incorporates a highly effective cooling system, ensuring that the machine operates smoothly even in high-temperature environments. This model is particularly suitable for applications requiring precision and reliability, making it a preferred choice among manufacturers.

Next in the series is the Premier HV 13, which is engineered for versatility and user-friendliness. This model features an intuitive interface that simplifies operation and maintenance, making it accessible to operators of varying skill levels. The HV 13 boasts a compact design, allowing it to fit into tighter spaces while still delivering exceptional performance. Its advanced filtration technology enhances air quality, making it ideal for indoor operations where environmental considerations are key.

The Premier HV 17 is the powerhouse of the series, equipped with cutting-edge technologies that enhance its operational capabilities. It incorporates smart monitoring systems, providing real-time data on performance metrics. This feature enables proactive maintenance and minimizes downtime, a critical aspect for industries that rely on continuous production. The HV 17 is also designed to handle heavy loads, making it suitable for demanding industrial applications.

Common characteristics across the Premier HV series include durable construction, low noise operation, and exceptional reliability. These machines are built to withstand harsh environments, thanks to their high-quality materials and robust engineering. The series also emphasizes sustainability, with energy-saving features that contribute to reduced operational costs and a smaller carbon footprint.

In conclusion, the Premier HV 15, HV 13, and HV 17 models exemplify innovation and efficiency in industrial machinery. Their advanced features, combined with a focus on user-friendliness and sustainability, position them as leading choices for businesses seeking to enhance productivity while maintaining environmental responsibility. Each model serves a distinct purpose within the HV series, ensuring that every industry requirement is met with precision and reliability.