HP Performance Optimized Data Center (POD) 40c manual Abstract, Part Number August Edition

Page 1

HP Performance Optimized Datacenter 40c G2 Site Preparation and Requirements Guide

Abstract

This document provides site preparation guidance for the HP Performance Optimized Datacenter 40c G2 (HP POD 40c G2).

Part Number: 695162-002

August 2012

Edition: 2

Image 1
Contents Part Number August Edition AbstractPage Contents Appendix C Regulatory compliance notices HP POD 40c G2 site assessment checklistOverview Safety and NEC complianceAbout this document Site assessment Site safety and securitySite preparation Fire detection and suppressionHP POD 40c G2 capacities Electrical power capacities critical IT powerHP POD 40c G2 capacity limitations Overall system capacitiesDimensions and clearances HP POD 40c G2 weightSite requirements Site padSite requirements Safety and clearance area Future expansions Grounding requirementsUtilities Grounding feature SpecificationHumidifier water supply Requirement Location Specification Requirement SpecificationDrainage Chilled water supply10-2500 µmhos Electrical power system configuration Power infrastructure installationPiping materials Site electrical systemTransformers and switchboards Environmental control system Supported facility connectionsAdditional POD connections Connection portalsDemarcation box Fire box Humidifier Fire, safety, and security notificationsHP POD 40c G2 security G2 is shut down Environmental considerations Areas prone to lightning or power surgesEnvironmental risks Cold weatherCompleting a site assessment Site plan requirements and actionsHP Site Preparation Drawing Package Zoning and permit requirementsSite planning HP POD 40c G2 installationHP POD 40c G2 storage requirements Assembly equipment locationsSite plan requirements and actions Appendix a HP site assessment HP POD 40c G2 site assessment checklistAs stated by the site engineering personnel can be Description Sign-offExisting or planned supply/return headers Security Customer responsibilities Description Sign-offProvide assistance in instances where a temporary Installation prerequisites HP POD 40c G2 site readiness checklistAppendix B Preparing for delivery Pre-delivery tasksWhen installing on an elevated surface, verify that General water supply Description Sign-off Power requirements Description Sign-offChilled water system Description Sign-off General Description Sign-offDescription Sign-off HP POD 40c G2 regulatory compliance Appendix C Regulatory compliance noticesRegulatory compliance identification numbers Federal Communications Commission noticeCanadian notice Avis Canadien CablesGlossary North American Uninterruptible power systemVery early smoke detection apparatus Documentation feedback Index Index
Related manuals
Manual 84 pages 34.53 Kb