HP Performance Optimized Data Center (POD) 40c manual Safety and clearance area

Page 10

Top view clearances shown

Side view clearances shown

Adequate space around the HP POD 40c G2 is necessary for airflow and cooling purposes.

These minimum clearances provide room for door opening only. Consider additional space as necessary for your site.

Safety and clearance area

WARNING: Check for electrical distribution and transmission lines in, over, and under the construction site and maintain a safe working clearance from energized electrical lines. Consult your local utility company or AHJ for required clearances.

Site requirements 10

Image 10
Contents Abstract Part Number August EditionPage Contents HP POD 40c G2 site assessment checklist Appendix C Regulatory compliance noticesOverview Safety and NEC complianceAbout this document Site preparation Site safety and securitySite assessment Fire detection and suppression HP POD 40c G2 capacity limitations Electrical power capacities critical IT power HP POD 40c G2 capacities Overall system capacitiesSite requirements HP POD 40c G2 weightDimensions and clearances Site padSite requirements Safety and clearance area Grounding requirements Future expansionsUtilities Grounding feature SpecificationHumidifier water supply Drainage Requirement SpecificationRequirement Location Specification Chilled water supply10-2500 µmhos Piping materials Power infrastructure installationElectrical power system configuration Site electrical systemTransformers and switchboards Additional POD connections Supported facility connectionsEnvironmental control system Connection portalsDemarcation box Fire box Humidifier Fire, safety, and security notificationsHP POD 40c G2 security G2 is shut down Environmental risks Areas prone to lightning or power surgesEnvironmental considerations Cold weatherHP Site Preparation Drawing Package Site plan requirements and actionsCompleting a site assessment Zoning and permit requirementsHP POD 40c G2 installation Site planningAssembly equipment locations HP POD 40c G2 storage requirementsSite plan requirements and actions HP POD 40c G2 site assessment checklist Appendix a HP site assessmentDescription Sign-off As stated by the site engineering personnel can beCustomer responsibilities Description Sign-off Existing or planned supply/return headers SecurityProvide assistance in instances where a temporary Appendix B Preparing for delivery HP POD 40c G2 site readiness checklistInstallation prerequisites Pre-delivery tasksWhen installing on an elevated surface, verify that Chilled water system Description Sign-off Power requirements Description Sign-offGeneral water supply Description Sign-off General Description Sign-offDescription Sign-off Regulatory compliance identification numbers Appendix C Regulatory compliance noticesHP POD 40c G2 regulatory compliance Federal Communications Commission noticeCables Canadian notice Avis CanadienGlossary North American Uninterruptible power systemVery early smoke detection apparatus Documentation feedback Index Index
Related manuals
Manual 84 pages 34.53 Kb