Item |
| Description |
| |
|
|
|
|
|
13. Chilled water |
| Determine the overall chilled water capacity, available |
|
|
infrastructure |
| flow rates, and supply/return temperature restrictions. |
|
|
|
| Determine if there are any site specific requirements |
|
|
|
| that mandate additional chilled water equipment, such |
|
|
|
| as heat exchangers or mixing apparatus. Locate any |
|
|
|
| existing or planned supply/return headers. |
|
|
14. Security |
| Conduct interviews with the customer site engineering |
|
|
|
| personnel to determine the level of security required for |
|
|
|
| the HP POD 40c G2 and its infrastructure. The |
|
|
|
| proposed installation site is assessed for suitability in |
|
|
|
| relation to the customer requirements. |
|
|
15. |
| Following the HP installation site visit, analyze the data |
|
|
Recommendations |
| collected and prepare a report of findings. HP must |
|
|
|
| identify potential obstacles to installation and |
|
|
|
| recommendations for any additional testing or |
|
|
|
| changes to the installation plan. |
|
|
Customer responsibilities |
|
| ||
|
|
| ||
Item | Description |
|
| |
|
|
|
| |
1. Point of contact | Provide HP with the name and telephone number of the |
|
| |
information | designated point of contact for the purposes of this |
|
| |
| service. |
|
| |
2. Service listing | Provide all information required under this service listing |
|
| |
information | or reasonably determined by HP to be necessary to |
|
| |
| deliver the service, including but without limitation, any |
|
| |
| documentation (internal or external) regarding prior |
|
| |
| plans or investigations used to identify the proposed |
|
| |
| installation site. |
|
| |
3. Timely | Provide a timely response (such as, in a time period that |
|
| |
response | does not adversely affect the HP scheduled performance |
|
| |
| of the service) to all requests for information by HP. |
|
| |
4. Access to | Provide HP access to all subject areas and support areas, |
|
| |
subject areas and | including the proposed installation site and the |
|
| |
support areas | mechanical or electrical infrastructure provided to |
|
| |
| support the HP POD 40c G2. |
|
| |
5. Badge access | Provide HP badge access or an escort for the duration of |
|
| |
| the site visit to facilitate required access to all necessary |
|
| |
| areas. |
|
| |
6. Site | Customer site engineering personnel familiar with the |
|
| |
engineering | proposed installation site and personnel responsible for |
|
| |
personnel | the maintenance and support of the existing infrastructure |
|
| |
| must be available to answer questions. |
|
| |
7. Documentation | Provide HP copies of all available mechanical and |
|
| |
| electrical system design documentation, including |
|
| |
| drawings and electrical |
|
| |
| appropriate to the specific location, provide HP with |
|
| |
| campus maps, building drawings, floor plans, and other |
|
| |
| relevant prints to assist in the documentation and |
|
| |
| evaluation of the proposed installation site. |
|
| |
8. Network | Provide HP information regarding the planned network |
|
| |
infrastructure | infrastructure connection points and pathways. |
|
| |
information |
|
|
|
|
|
|