HP Performance Optimized Data Center (POD) 40c manual Fire box

Page 19

End view shown

You must make the connections between the facility and the HP POD 40c G2. For configuration and installation instructions, consult with HP.

Fire box

The communication connections between the fire system and the HP POD 40c G2 are made through the fire box.

End view shown

You must make the connections between the facility and the HP POD 40c G2. For configuration and installation instructions, consult with HP.

Supported facility connections 19

Image 19
Contents Part Number August Edition AbstractPage Contents Appendix C Regulatory compliance notices HP POD 40c G2 site assessment checklistOverview Safety and NEC complianceAbout this document Fire detection and suppression Site safety and securitySite assessment Site preparationOverall system capacities Electrical power capacities critical IT powerHP POD 40c G2 capacities HP POD 40c G2 capacity limitationsSite pad HP POD 40c G2 weightDimensions and clearances Site requirementsSite requirements Safety and clearance area Future expansions Grounding requirementsUtilities Grounding feature SpecificationHumidifier water supply Chilled water supply Requirement SpecificationRequirement Location Specification Drainage10-2500 µmhos Site electrical system Power infrastructure installationElectrical power system configuration Piping materials Transformers and switchboards Connection portals Supported facility connectionsEnvironmental control system Additional POD connectionsDemarcation box Fire box Humidifier Fire, safety, and security notificationsHP POD 40c G2 security G2 is shut down Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental risksZoning and permit requirements Site plan requirements and actionsCompleting a site assessment HP Site Preparation Drawing PackageSite planning HP POD 40c G2 installationHP POD 40c G2 storage requirements Assembly equipment locationsSite plan requirements and actions Appendix a HP site assessment HP POD 40c G2 site assessment checklistAs stated by the site engineering personnel can be Description Sign-offExisting or planned supply/return headers Security Customer responsibilities Description Sign-offProvide assistance in instances where a temporary Pre-delivery tasks HP POD 40c G2 site readiness checklistInstallation prerequisites Appendix B Preparing for deliveryWhen installing on an elevated surface, verify that General Description Sign-off Power requirements Description Sign-offGeneral water supply Description Sign-off Chilled water system Description Sign-offDescription Sign-off Federal Communications Commission notice Appendix C Regulatory compliance noticesHP POD 40c G2 regulatory compliance Regulatory compliance identification numbersCanadian notice Avis Canadien CablesGlossary North American Uninterruptible power systemVery early smoke detection apparatus Documentation feedback Index Index