HP Performance Optimized Data Center (POD) 40c manual Index

Page 41

R

regulatory compliance identification numbers 35 regulatory compliance, HP POD 40c G2 35

S

safety information 6, 10 security 6, 20 seismic activity 22

site assessment 6, 23, 27 site assessment checklist 27 site pad 8

site planning considerations 24 site preparation 6

site preparation checklist 31 site requirements 8 storage locations 25 supported facility connections 17 system capacity 7

T

transformer and switchboard 16

U

utilities 12

V

vestibule specifications 25

W

water supply 12, 13 weight 8

Z

zoning and permit requirements 23

Index 41

Image 41
Contents Part Number August Edition AbstractPage Contents Appendix C Regulatory compliance notices HP POD 40c G2 site assessment checklistAbout this document Safety and NEC complianceOverview Site assessment Site safety and securitySite preparation Fire detection and suppressionHP POD 40c G2 capacities Electrical power capacities critical IT powerHP POD 40c G2 capacity limitations Overall system capacitiesDimensions and clearances HP POD 40c G2 weightSite requirements Site padSite requirements Safety and clearance area Future expansions Grounding requirementsHumidifier water supply Grounding feature SpecificationUtilities Requirement Location Specification Requirement SpecificationDrainage Chilled water supply10-2500 µmhos Electrical power system configuration Power infrastructure installationPiping materials Site electrical systemTransformers and switchboards Environmental control system Supported facility connectionsAdditional POD connections Connection portalsDemarcation box Fire box HP POD 40c G2 security Fire, safety, and security notificationsHumidifier G2 is shut down Environmental considerations Areas prone to lightning or power surgesEnvironmental risks Cold weatherCompleting a site assessment Site plan requirements and actionsHP Site Preparation Drawing Package Zoning and permit requirementsSite planning HP POD 40c G2 installationHP POD 40c G2 storage requirements Assembly equipment locationsSite plan requirements and actions Appendix a HP site assessment HP POD 40c G2 site assessment checklistAs stated by the site engineering personnel can be Description Sign-offExisting or planned supply/return headers Security Customer responsibilities Description Sign-offProvide assistance in instances where a temporary Installation prerequisites HP POD 40c G2 site readiness checklistAppendix B Preparing for delivery Pre-delivery tasksWhen installing on an elevated surface, verify that General water supply Description Sign-off Power requirements Description Sign-offChilled water system Description Sign-off General Description Sign-offDescription Sign-off HP POD 40c G2 regulatory compliance Appendix C Regulatory compliance noticesRegulatory compliance identification numbers Federal Communications Commission noticeCanadian notice Avis Canadien CablesGlossary Very early smoke detection apparatus Uninterruptible power system North American Documentation feedback Index Index