Item | Description |
|
|
|
|
8. Clearances | Inspect the proposed installation site to confirm |
|
| clearance requirements for installation and |
|
| serviceability as per the HP POD 40c G2 |
|
| specifications. Necessary clearances are determined, |
|
| in part, based on the specific installation plans and |
|
| infrastructure design. Location, orientation, and |
|
| planned utilization can affect the necessary |
|
| clearances. Consider future planning for the space |
|
| around the installation site. |
|
9. Support | Evaluate the HP POD 40c G2 installation site in |
|
infrastructure | relation to the planned support infrastructure location. |
|
location | Conduit lengths and the utility pathway design must be |
|
| taken into consideration in the planning stages. The |
|
| proposed support infrastructure design and the |
|
| location of required utilities are discussed with the |
|
| customer's site engineering personnel to identify |
|
| elements that can impact the HP POD 40c G2 |
|
| installation site decisions. |
|
10. Support | Evaluate the proposed installation site for the HP POD |
|
infrastructure for | 40c G2 and the support infrastructure for access |
|
access requirements | requirements. The evaluation is based on the |
|
| information provided by the customer at the time of the |
|
| site visit. In the absence of |
|
| information, general requirements are used as the |
|
| basis for the evaluation. The delivery path is visually |
|
| examined and discussed with the customer's site |
|
| engineering personnel to identify obstacles to |
|
| installation. |
|
11. Site engineering | Conduct interviews with the customer's site |
|
interviews | engineering personnel and site facilities personnel to |
|
| gather information related to the origin of the power |
|
| source and network services proposed for use with the |
|
| HP POD 40c G2. HP must visually inspect the |
|
| proposed power protection equipment. Means of |
|
| delivery, connections, and pathways are documented. |
|
12. Capacity of | Based on the review of |
|
electrical | documentation (such as |
|
infrastructure | drawings), examine equipment panels and monitoring |
|
| system data, as available. HP must determine whether |
|
| adequate capacity exists in the current electrical |
|
| infrastructure to be used or if additional study is |
|
| required. Determine if the level of redundancy required |
|
| as stated by the site engineering personnel can be |
|
| provided by using the existing infrastructure. This takes |
|
| into consideration the proposed installation site of the |
|
| HP POD 40c G2, the potential HP POD 40c G2 |
|
| payload, and the customer stated redundancy |
|
| requirement. Components can include generators, |
|
| UPSs, and switch gear. |
|
Appendix A: HP site assessment 28