HP Performance Optimized Data Center (POD) 40c manual Description Sign-off

Page 34

Item

Description

Sign-off

 

 

 

3

Verify that the HP Project Team coordinates with other site

 

 

construction activities.

 

Appendix B: Preparing for delivery 34

Image 34
Contents Abstract Part Number August EditionPage Contents HP POD 40c G2 site assessment checklist Appendix C Regulatory compliance noticesOverview Safety and NEC complianceAbout this document Site preparation Site safety and securitySite assessment Fire detection and suppressionHP POD 40c G2 capacity limitations Electrical power capacities critical IT powerHP POD 40c G2 capacities Overall system capacitiesSite requirements HP POD 40c G2 weightDimensions and clearances Site padSite requirements Safety and clearance area Grounding requirements Future expansionsUtilities Grounding feature SpecificationHumidifier water supply Drainage Requirement SpecificationRequirement Location Specification Chilled water supply10-2500 µmhos Piping materials Power infrastructure installationElectrical power system configuration Site electrical systemTransformers and switchboards Additional POD connections Supported facility connectionsEnvironmental control system Connection portalsDemarcation box Fire box Humidifier Fire, safety, and security notificationsHP POD 40c G2 security G2 is shut down Environmental risks Areas prone to lightning or power surgesEnvironmental considerations Cold weatherHP Site Preparation Drawing Package Site plan requirements and actionsCompleting a site assessment Zoning and permit requirementsHP POD 40c G2 installation Site planningAssembly equipment locations HP POD 40c G2 storage requirementsSite plan requirements and actions HP POD 40c G2 site assessment checklist Appendix a HP site assessmentDescription Sign-off As stated by the site engineering personnel can beCustomer responsibilities Description Sign-off Existing or planned supply/return headers SecurityProvide assistance in instances where a temporary Appendix B Preparing for delivery HP POD 40c G2 site readiness checklist Installation prerequisites Pre-delivery tasksWhen installing on an elevated surface, verify that Chilled water system Description Sign-off Power requirements Description Sign-offGeneral water supply Description Sign-off General Description Sign-offDescription Sign-off Regulatory compliance identification numbers Appendix C Regulatory compliance noticesHP POD 40c G2 regulatory compliance Federal Communications Commission noticeCables Canadian notice Avis CanadienGlossary North American Uninterruptible power systemVery early smoke detection apparatus Documentation feedback Index Index
Related manuals
Manual 84 pages 34.53 Kb