HP Performance Optimized Data Center (POD) 40c manual Contents

Page 3

Contents

 

Overview

5

About this document

5

Safety and NEC compliance

5

Site assessment

6

Site preparation

6

Site safety and security

6

Fire detection and suppression

6

HP POD 40c G2 capacities

7

HP POD 40c G2 capacity limitations

7

Electrical power capacities (critical IT power)

7

Mechanical cooling capacities

7

Overall system capacities

7

Site requirements

8

Site pad

8

HP POD 40c G2 weight

8

Dimensions and clearances

8

Safety and clearance area

10

Future expansions

11

Grounding requirements

11

Utilities

12

Humidifier water supply

12

Drainage

13

Chilled water supply

13

Piping materials

15

Power infrastructure installation

15

Site electrical system

15

Electrical power system configuration

15

Transformers and switchboards

16

Supported facility connections

17

Environmental control system

17

Additional POD connections

17

Connection portals

17

Demarcation box

18

Fire box

19

Humidifier

20

HP POD 40c G2 security

20

Fire, safety, and security notifications

20

Environmental considerations

22

Environmental risks

22

Cold weather

22

Areas prone to lightning or power surges

22

Seismic activity

22

Site plan requirements and actions

23

Contents

3

Image 3
Contents Part Number August Edition AbstractPage Contents Appendix C Regulatory compliance notices HP POD 40c G2 site assessment checklistSafety and NEC compliance OverviewAbout this document Fire detection and suppression Site safety and securitySite assessment Site preparationOverall system capacities Electrical power capacities critical IT powerHP POD 40c G2 capacities HP POD 40c G2 capacity limitationsSite pad HP POD 40c G2 weightDimensions and clearances Site requirementsSite requirements Safety and clearance area Future expansions Grounding requirementsGrounding feature Specification UtilitiesHumidifier water supply Chilled water supply Requirement SpecificationRequirement Location Specification Drainage10-2500 µmhos Site electrical system Power infrastructure installationElectrical power system configuration Piping materialsTransformers and switchboards Connection portals Supported facility connectionsEnvironmental control system Additional POD connectionsDemarcation box Fire box Fire, safety, and security notifications HumidifierHP POD 40c G2 security G2 is shut down Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental risksZoning and permit requirements Site plan requirements and actionsCompleting a site assessment HP Site Preparation Drawing PackageSite planning HP POD 40c G2 installationHP POD 40c G2 storage requirements Assembly equipment locationsSite plan requirements and actions Appendix a HP site assessment HP POD 40c G2 site assessment checklistAs stated by the site engineering personnel can be Description Sign-offExisting or planned supply/return headers Security Customer responsibilities Description Sign-offProvide assistance in instances where a temporary Pre-delivery tasks HP POD 40c G2 site readiness checklistInstallation prerequisites Appendix B Preparing for deliveryWhen installing on an elevated surface, verify that General Description Sign-off Power requirements Description Sign-offGeneral water supply Description Sign-off Chilled water system Description Sign-offDescription Sign-off Federal Communications Commission notice Appendix C Regulatory compliance noticesHP POD 40c G2 regulatory compliance Regulatory compliance identification numbersCanadian notice Avis Canadien CablesGlossary Uninterruptible power system North AmericanVery early smoke detection apparatus Documentation feedback Index Index
Related manuals
Manual 84 pages 34.53 Kb