HP POD 40c G2 capacity limitations

The capacity limitations for the HP POD 40c G2 are separated into two categories: electrical power and mechanical cooling capacities. Both of these categories are interdependent and must be considered in conjunction with the overall customer requirements.

Electrical power capacities (critical IT power)

The electrical system of the HP POD 40c G2 has two main feeds, A and B, each rated at 800 A 415 VAC Wye 3-Phase.

Mechanical cooling capacities

The HP POD 40c G2 cooling system consists of 6 zones. Each zone includes 2 heat exchangers and 18 fans. Cooling capacities are based on:

Chilled water inlet temperature of 15.6ºC (60ºF)

Heat exchanger fluid delta temperature of 5.5ºC (10ºF)

Pure water cooling

Chilled water flow rate of 908 lpm (240 gpm)

Average air flow of 2000 cfm per rack

Overall system capacities

The HP POD 40c G2 overall system capacities are provided in the following table. It is the customer's responsibility to understand the level of redundancy required for their particular application and its associated limiting factor.

Redundancy level

Electrical (kW)

Thermal (kW)

Limiting factor

 

 

 

 

N

600

Thermal*

N+1

400

Thermal*

2N

576

300

Thermal*

*The thermal limitation factors are described in "Mechanical cooling capacities (on page 7)."

HP POD 40c G2 capacities 7

Image 7
Contents Part Number August Edition AbstractPage Contents Appendix C Regulatory compliance notices HP POD 40c G2 site assessment checklistOverview Safety and NEC complianceAbout this document Fire detection and suppression Site safety and securitySite assessment Site preparationOverall system capacities Electrical power capacities critical IT powerHP POD 40c G2 capacities HP POD 40c G2 capacity limitationsSite pad HP POD 40c G2 weightDimensions and clearances Site requirementsSite requirements Safety and clearance area Future expansions Grounding requirementsUtilities Grounding feature SpecificationHumidifier water supply Chilled water supply Requirement SpecificationRequirement Location Specification Drainage10-2500 µmhos Site electrical system Power infrastructure installationElectrical power system configuration Piping materialsTransformers and switchboards Connection portals Supported facility connectionsEnvironmental control system Additional POD connectionsDemarcation box Fire box Humidifier Fire, safety, and security notificationsHP POD 40c G2 security G2 is shut down Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental risksZoning and permit requirements Site plan requirements and actionsCompleting a site assessment HP Site Preparation Drawing PackageSite planning HP POD 40c G2 installationHP POD 40c G2 storage requirements Assembly equipment locationsSite plan requirements and actions Appendix a HP site assessment HP POD 40c G2 site assessment checklistAs stated by the site engineering personnel can be Description Sign-offExisting or planned supply/return headers Security Customer responsibilities Description Sign-offProvide assistance in instances where a temporary Pre-delivery tasks HP POD 40c G2 site readiness checklistInstallation prerequisites Appendix B Preparing for deliveryWhen installing on an elevated surface, verify that General Description Sign-off Power requirements Description Sign-offGeneral water supply Description Sign-off Chilled water system Description Sign-offDescription Sign-off Federal Communications Commission notice Appendix C Regulatory compliance noticesHP POD 40c G2 regulatory compliance Regulatory compliance identification numbersCanadian notice Avis Canadien CablesGlossary North American Uninterruptible power systemVery early smoke detection apparatus Documentation feedback Index Index