HP Performance Optimized Data Center (POD) 40c manual Demarcation box

Page 18

Top view shown

Connection portal

Connection point

Quantity

diameter

 

 

 

 

 

 

10.16 cm (4 in) portal

Main electrical power

8

 

feeds

 

5.08 cm (2 in) portal

Communication connection

2

 

for all communication

 

 

ECS

 

 

EPO

 

 

Fire alarm

 

 

Telephone

 

 

 

 

 

Demarcation box

The following communication connections between the customer facility and the HP POD 40c G2 are made through the demarcation box:

ECS communication

Security communication

Telephone

Supported facility connections 18

Image 18
Contents Abstract Part Number August EditionPage Contents HP POD 40c G2 site assessment checklist Appendix C Regulatory compliance noticesSafety and NEC compliance OverviewAbout this document Site preparation Site safety and securitySite assessment Fire detection and suppressionHP POD 40c G2 capacity limitations Electrical power capacities critical IT powerHP POD 40c G2 capacities Overall system capacitiesSite requirements HP POD 40c G2 weightDimensions and clearances Site padSite requirements Safety and clearance area Grounding requirements Future expansionsGrounding feature Specification UtilitiesHumidifier water supply Drainage Requirement SpecificationRequirement Location Specification Chilled water supply10-2500 µmhos Piping materials Power infrastructure installationElectrical power system configuration Site electrical systemTransformers and switchboards Additional POD connections Supported facility connectionsEnvironmental control system Connection portalsDemarcation box Fire box Fire, safety, and security notifications HumidifierHP POD 40c G2 security G2 is shut down Environmental risks Areas prone to lightning or power surgesEnvironmental considerations Cold weatherHP Site Preparation Drawing Package Site plan requirements and actionsCompleting a site assessment Zoning and permit requirementsHP POD 40c G2 installation Site planningAssembly equipment locations HP POD 40c G2 storage requirementsSite plan requirements and actions HP POD 40c G2 site assessment checklist Appendix a HP site assessmentDescription Sign-off As stated by the site engineering personnel can beCustomer responsibilities Description Sign-off Existing or planned supply/return headers SecurityProvide assistance in instances where a temporary Appendix B Preparing for delivery HP POD 40c G2 site readiness checklistInstallation prerequisites Pre-delivery tasksWhen installing on an elevated surface, verify that Chilled water system Description Sign-off Power requirements Description Sign-offGeneral water supply Description Sign-off General Description Sign-offDescription Sign-off Regulatory compliance identification numbers Appendix C Regulatory compliance noticesHP POD 40c G2 regulatory compliance Federal Communications Commission noticeCables Canadian notice Avis CanadienGlossary Uninterruptible power system North AmericanVery early smoke detection apparatus Documentation feedback Index Index
Related manuals
Manual 84 pages 34.53 Kb

Performance Optimized Data Center (POD) 40c specifications

The HP Performance Optimized Data Center (POD) 40c is a state-of-the-art data center solution designed to meet the increasing demands for efficiency, scalability, and flexibility in enterprise environments. Aimed at delivering high-performance computing with minimal environmental impact, the POD 40c integrates innovative technologies and features to optimize operations.

One of the standout characteristics of the POD 40c is its modular design, allowing for easy deployment and scalability. Customers can configure their data center according to specific requirements, enabling rapid expansion as business needs evolve. The POD can house up to 240 servers, providing ample capacity to support intensive workloads while ensuring that users can quickly adapt to changing technological landscapes.

The energy efficiency of the POD 40c is a significant highlight. By employing advanced cooling technologies, including hot aisle/cold aisle containment and direct expansion cooling, it minimizes energy consumption while maintaining optimal temperatures for hardware components. This focus on efficiency also extends to power management, with redundant power supplies and the integration of high-efficiency power distribution units (PDUs) that help reduce operational costs.

In terms of connectivity, the HP POD 40c is equipped with comprehensive networking capabilities. The design includes integrated cabling systems that ensure organized and efficient routing of power and data. This dedication to streamlined connectivity facilitates faster data transfer rates and decreases latency, enhancing overall system performance.

Moreover, security is a paramount consideration in the POD 40c design. The unit incorporates various security features, including access controls, environmental monitoring, and surveillance options, which provide peace of mind for data-sensitive businesses. These elements work together to ensure that critical data remains protected from unauthorized access and environmental threats.

Sustainability is another key aspect, as the POD 40c is designed to be environmentally friendly. The system's effective cooling mechanisms and efficient power usage contribute to reduced carbon emissions, aligning with corporate sustainability goals and industry regulations.

In conclusion, the HP Performance Optimized Data Center (POD) 40c represents a cutting-edge solution for modern data center requirements. Its modularity, energy efficiency, robust connectivity, enhanced security, and sustainability make it an attractive option for organizations aiming to optimize their IT infrastructure while maintaining agility in a rapidly evolving digital landscape. The POD 40c exemplifies HP's commitment to providing innovative and performance-driven data center solutions, positioning it as a transformative asset for businesses seeking to thrive in a data-driven world.