HP Performance Optimized Data Center (POD) 40c manual Site plan requirements and actions

Page 26

Access landings might be required to maintain the required access to the HP POD 40c G2 electrical panels.

Site plan requirements and actions 26

Image 26
Contents Abstract Part Number August EditionPage Contents HP POD 40c G2 site assessment checklist Appendix C Regulatory compliance noticesAbout this document Safety and NEC complianceOverview Site preparation Site safety and securitySite assessment Fire detection and suppressionHP POD 40c G2 capacity limitations Electrical power capacities critical IT powerHP POD 40c G2 capacities Overall system capacitiesSite requirements HP POD 40c G2 weightDimensions and clearances Site padSite requirements Safety and clearance area Grounding requirements Future expansionsHumidifier water supply Grounding feature SpecificationUtilities Drainage Requirement SpecificationRequirement Location Specification Chilled water supply10-2500 µmhos Piping materials Power infrastructure installationElectrical power system configuration Site electrical systemTransformers and switchboards Additional POD connections Supported facility connectionsEnvironmental control system Connection portalsDemarcation box Fire box HP POD 40c G2 security Fire, safety, and security notificationsHumidifier G2 is shut down Environmental risks Areas prone to lightning or power surgesEnvironmental considerations Cold weather HP Site Preparation Drawing Package Site plan requirements and actions Completing a site assessment Zoning and permit requirementsHP POD 40c G2 installation Site planningAssembly equipment locations HP POD 40c G2 storage requirementsSite plan requirements and actions HP POD 40c G2 site assessment checklist Appendix a HP site assessmentDescription Sign-off As stated by the site engineering personnel can beCustomer responsibilities Description Sign-off Existing or planned supply/return headers SecurityProvide assistance in instances where a temporary Appendix B Preparing for delivery HP POD 40c G2 site readiness checklistInstallation prerequisites Pre-delivery tasksWhen installing on an elevated surface, verify that Chilled water system Description Sign-off Power requirements Description Sign-offGeneral water supply Description Sign-off General Description Sign-offDescription Sign-off Regulatory compliance identification numbers Appendix C Regulatory compliance noticesHP POD 40c G2 regulatory compliance Federal Communications Commission noticeCables Canadian notice Avis CanadienGlossary Very early smoke detection apparatus Uninterruptible power systemNorth American Documentation feedback Index Index
Related manuals
Manual 84 pages 34.53 Kb