Environmental considerations

Environmental risks

Avoid placing the HP POD 40c G2 directly along a drainage path or in an area prone to flooding.

Verify that the HP POD 40c G2 is properly grounded in accordance with NFPA 70 and local and regional regulations (IEC for EMEA and APJ).

Cold weather

The HP POD 40c G2 requires a site chilled water supply and return, humidifier supply and drain, and condensate drains. Extreme cold weather can cause damage to the supply and drain lines. Evaluate the following for additional cold weather protection:

Regional location of the HP POD 40c G2

Exposure of the supply and drain lines to extreme cold temperatures

Extreme cold weather can affect crane and lifting operations. When temperatures drop below -12.2°C (10°F), appropriate consideration must be made with respect to shock loading, crane hydraulics, and possible de-rating of the crane.

Areas prone to lightning or power surges

The HP POD 40c G2 structure and internal components are all bonded together. A common Grounding Electrode Conductor Connection point is provided. Proper bonding and grounding of the HP POD 40c G2 minimizes the effects of a lightning strike. A surge protection device is provided on the HP POD 40c G2 input connection to protect the HP POD 40c G2 electrical system from voltage transients. If your site is in an area that is subject to frequent lightning strikes, the HP POD 40c G2 must be protected in accordance with NFPA 70 (NA) and IEC (EMEA and APJ). HP recommends that you contact a certified lightning protection consultant.

Seismic activity

If your site is in an area that has frequent seismic activity, HP recommends that you contact a seismic activity consultant. If your site is in an area that has high vibration level, HP recommends that you contact a vibration isolation consultant. You must specify the method of anchoring the HP POD 40c G2, if necessary.

Environmental considerations 22

Image 22
Contents Abstract Part Number August EditionPage Contents HP POD 40c G2 site assessment checklist Appendix C Regulatory compliance noticesOverview Safety and NEC complianceAbout this document Site preparation Site safety and securitySite assessment Fire detection and suppressionHP POD 40c G2 capacity limitations Electrical power capacities critical IT powerHP POD 40c G2 capacities Overall system capacitiesSite requirements HP POD 40c G2 weightDimensions and clearances Site padSite requirements Safety and clearance area Grounding requirements Future expansionsUtilities Grounding feature SpecificationHumidifier water supply Drainage Requirement SpecificationRequirement Location Specification Chilled water supply10-2500 µmhos Piping materials Power infrastructure installationElectrical power system configuration Site electrical systemTransformers and switchboards Additional POD connections Supported facility connectionsEnvironmental control system Connection portalsDemarcation box Fire box Humidifier Fire, safety, and security notificationsHP POD 40c G2 security G2 is shut down Environmental risks Areas prone to lightning or power surgesEnvironmental considerations Cold weatherHP Site Preparation Drawing Package Site plan requirements and actionsCompleting a site assessment Zoning and permit requirementsHP POD 40c G2 installation Site planningAssembly equipment locations HP POD 40c G2 storage requirementsSite plan requirements and actions HP POD 40c G2 site assessment checklist Appendix a HP site assessmentDescription Sign-off As stated by the site engineering personnel can beCustomer responsibilities Description Sign-off Existing or planned supply/return headers SecurityProvide assistance in instances where a temporary Appendix B Preparing for delivery HP POD 40c G2 site readiness checklistInstallation prerequisites Pre-delivery tasksWhen installing on an elevated surface, verify that Chilled water system Description Sign-off Power requirements Description Sign-offGeneral water supply Description Sign-off General Description Sign-offDescription Sign-off Regulatory compliance identification numbers Appendix C Regulatory compliance noticesHP POD 40c G2 regulatory compliance Federal Communications Commission noticeCables Canadian notice Avis CanadienGlossary North American Uninterruptible power systemVery early smoke detection apparatus Documentation feedback Index Index